Maintenance and Repair
MagnaTran 7.1 User’s Manual
Preventive Maintenance Schedule
MN-003-1600-00
Brooks Automation
9-2
Revision 2.2
Preventive Maintenance Schedule
This section provides the schedule and procedures for routine preventive mainte-
nance of the MagnaTran 7 Robot to reduce unscheduled down-time. It is recom-
mended that the preventive maintenance procedures and schedule provided in this
section be followed to extend the operating life of the Magna Tran 7 and to minimize
unscheduled down-time. If additional procedures are required they will be supplied
along with their maintenance schedules by Brooks Automation.
Before beginning any procedures in this chapter, read and understand
.
NOTE:
The following Preventive Maintenance Schedule is based on a certified clean, dry
environment. The user should adjust the Preventative Maintenance Schedule to
account for any deviations from this environment.
Schedule
is provided as a quick reference listing all maintenance procedures, the page
number of the procedure, and the frequency for performing the procedure.
Table 9-1: Preventive Maintenance Schedule
Procedure
Page #
Frequency
3 months
3 months
Encoder and Motor Coil Cables Inspection
3 months
3 months
3 months
Pads on End Effectors Inspection
3 months
3 months
As required
End Effector Pad Cleaning Procedure
As required
O-Ring Removal/Replacement/Cleaning
As required