Maintenance and Repair
MagnaTran 7.1 User’s Manual
Connection Inspection
MN-003-1600-00
Brooks Automation
9-12
Revision 2.2
Connection Inspection
Inspect all connections to the robot, PowerPak and power supply. Plugs should be
fully seated and mating hardware tight. Any locking devices should be in place.
Required Tools
•
none