8
9
www.bromicheating.com
www.bromicheating.com
HEATER INSTALLATION
CONTINUED...
611
78
904
78
2
3
4
2
3
(1) Mark mounting hole centres on ceiling or wall.
(2) Attach mounting brackets to ceiling or wall
using appropriate fasteners (Not supplied).
(3) Bring heater up to mounting brackets and lock
into position with M5x10 screw & nut.
(4) Rotate heater to required angle.
Lock into position with .
(5) Make electrical connection from heater to
power supply.
(1) Heater must be installed with heater surface
2400mm above the floor level. If required, cut
down length of chain to ensure correct
installation height.
(2) Attach chains to heater with "S" hooks. Crimp
"S" hooks closed after assembly.
(3) Prepare ceiling structure for heater. Attach
chains to ceiling structure & suspend heater.
(4) Make electrical connection from heater to
power supply. If required fix suply power cord to
ceiling chain with cable ties.
Mounting Hole Centres & Heater Position
2620213 (3000W) - 2620215 (6000W)
2620212 (2000W) - 2620214 (4000W)
1
CEILING & WALL MOUNTING
1. Mark mounting hole centres on ceiling or wall.
2. Attach mounting brackets to ceiling or wall using
appropriate fasteners (Not supplied).
3. Bring heater up to mounting brackets and lock
into position with M5x10 screw & nut.
4. Rotate heater to required angle. Lock into position
with self tapping screw.
5. Make electrical connection from heater to power
supply.
CHAIN SUSPENSION
(SOLD SEPARATELY)
1. Heater must be installed with heater surface
2400mm above the floor level. If required, cut
down length of chain to ensure correct installation
height.
2. Attach chains to heater with “S” hooks. Crimp “S”
hooks closed after assembly.
3. Prepare ceiling structure for heater. Attach chains
to ceiling structure & suspend heater.
4. Make electrical connection from heater to power
supply. If required fix suply power cord to ceiling
chain with cable ties.
2000W & 4000W Models
3000W & 6000W Models
31
575
625
2000W & 4000W Models
Mounting Hole Centres & Heater Position
1
31
918
868
3000W & 6000W Models
2
Suspension
20
10
6.5
DETAIL Suspension
SCALE 1 : 5
Suspension Tube
Mounting Hole
3
4
6
7
5
8
9
1. Mark mounting hole centres on ceiling.
Attach mounting brackets to ceiling using
appropriate fasteners (Not supplied).
2. Heater must be installed with heater surface at least
2400mm above the floor level.
Supplied suspension tubes position heater surface
1000mm below the ceiling surface.
If required, cut down length of suspension tubes to
ensure correct installation height.
Minimum distance from front surface of heater to
ceiling surface must be 250mm for 2000W & 3000W
models & 330mm for 4000W & 6000W models.
3. If suspension tubes are cut down, drill new mounting
holes in each tube.
4. Make electrical connection in junction box as per
electrical installation instructions in this manual.
5. Feed power cord through suspension tube.
6. Assemble suspension tubes to rear bracket with M5
screw, spring washer and nut.
7. Rotate heater to required angle. 15° or 30° in either
direction. Lock into position with self tapping screw.
8. Raise heater assembly into position.
Attach suspension tubes to ceiling brackets with
M5x35mm screws, spring washers & nuts.
9. Make electrical connection from suspension tube
power cord to power from ceiling as per
electrical installation instructions in this manual.
TUBE SUSPENSION (SOLD SEPARATELY)
TUBE SUSPENSION
(SOLD SEPARATELY)
1. Mark mounting hole centres on ceiling. Attach
mounting brackets to ceiling using appropriate
fasteners (Not supplied).
2. Heater must be installed with heater surface at least
2400mm above the floor level. Supplied suspension
tubes position heater surface 1000mm below the
ceiling surface. If required, cut down length of
suspension tubes to ensure correct installation
height. Minimum distance from front surface of
heater to ceiling surface must be 250mm for 2000W
& 3000W models & 330mm for 4000W & 6000W
models.
3. If suspension tubes are cut down, drill new mounting
holes in each tube.
4. Make electrical connection in junction box as per
electrical installation instructions in this manual.
5. Feed power cord through suspension tube.
6. Assemble suspension tubes to rear bracket with M5
screw, spring washer and nut.
7. Rotate heater to required angle. 15° or 30° in either
direction. Lock into position with self tapping screw.
8. Raise heater assembly into position. Attach
suspension tubes to ceiling brackets with M5x35mm
screws, spring washers & nuts.
9. Make electrical connection from suspension tube
power cord to power from ceiling as per electrical
installation instructions in this manual.
HEATER INSTALLATION
CONTINUED...