2. When raising the boom or moving the unit with boom elevated, be sure there is adequate
overhead clearance for boom.
3. For carrying loads on decks:
A. Boom must be retracted, centered and lowered as close as possible.
B. 2 MPH (3km/h) maximum road speed. Reduce speed below 2 MPH (3km/h) to
properly match condition of road surface and deck load stability.
C. Remove load hook from load before traveling.
4. Cranes with rear steering require close watch because of "tail swing" when the chassis is
turned in tight quarters.
5.
6. Every effort has been made to make the BMC Industrial Crane a stable vehicle. However,
with the rigid front axle and the unsprung oscillating rear axle suspension, the operator
must take care to control the vehicle speed to be compatible with conditions of rough
roads or uneven terrain.
7. When this crane is to be parked on a grade, set parking brake and block wheels or extend
outriggers fully.
C A U T I O N
Driving the unit in four-wheel drive on hard surfaces such as concrete or asphalt may
damage the differential.
8. Do not drive the unit in four-wheel-drive on hard surfaces such as concrete or asphalt.
Shift to gears 4-6 forward or 3
rd
gear in reverse.
9. Shut off engine before refueling, and remove fuel cap slowly. Vapor pressure in tank can
cause a burst of fuel and vapor when the cap is removed. Aways refuel with proper fuel
and into proper tank.
10. Know your visibility limitations. Loads being carried on the deck or hanging on the hook
can add further limitations to visibility during travel. Always use a signal person when in
doubt.
Summary of Contents for IC-200-2J
Page 6: ...1 2 IC 200 2J DIMENSIONS...
Page 7: ...1 3 IC 200 3J DIMENSIONS...
Page 8: ...1 4 IC 200 J TURNING DIMENSIONS...
Page 20: ......
Page 34: ...2 14...
Page 35: ...2 15...
Page 55: ...3 9 IC 200 LUBRICATION CHART...
Page 62: ...3 16...
Page 63: ...3 17...
Page 71: ...3 25 IC 200 3 BOOM CHAIN ADJUSTMENT...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......