3-12
7.
Slowly rotate the hoist while applying tension on the cable in front of the boom.
Wear heavy leather gloves and wrap rags around the cable to wipe off any dirt from
the cable. Keep hands away from the sheaves and hoist drum while the cable is
moving.
8.
After two turns of the hoist drum, stop the hoist and push the cable tightly against
the flange of the drum with a wooden or rubber mallet.
9.
Slowly rotate the drum until the first layer of cable is on the drum. If any gaps
between the rope appear, stop the hoist and tap the cable toward the flange. There
must be no gaps.
10. After the first layer is on the drum, the hoist may be turned a little faster until the
remainder of the cable is installed.
11. Leave about 15 feet (4.6 m) of cable on the ground to install the sheave block. See
the
Operation Section
for instructions on reeving and wedge socket attachment.
12. Install the cable retainer pins and cotters in the tip sheave plates.
13. For the cable break in, lower the outriggers and attach a load of about 1000 pounds
(450 kg). Extend the boom fully. Position the load at a 6-foot (2.0 m) load radius
over the left-hand side of the crane. Hoist and lower the load three times, and
check winding of the rope on the hoist.
14. Attach about 2500 pounds (1100 kg) and repeat. Be sure that the cable winds
evenly on the hoist.
15. If the cable appears to twist too much, remove the sheave block and rewind the
cable on the drum as in Steps 7-11.
16. Never lift more than the rated load on the Capacity Chart for the parts of line and
type of wire rope being used.
17. Lubricate the cable as recommended in the
Wire Rope Lubrication Section
.
Inspect, maintain and replace the cable in accordance with ASME B30.5, Section
5-2.4.
Summary of Contents for IC-20-1K
Page 6: ...1 2 DIMENSIONS AND ORIENTATION IC 20 1K...
Page 7: ...1 3 TURNING DIMENSIONS...
Page 25: ...2 11...
Page 26: ...2 12...
Page 36: ......
Page 45: ...3 9 IC 20 LUBRICATION CHART...
Page 49: ...3 13 JIC SCHEMATIC...
Page 51: ...3 15 STEERING SYSTEM...
Page 53: ...3 17 IC 20 PROPULSION SYSTEM...
Page 63: ......
Page 64: ......
Page 65: ......