![Brobo 3M Series Product And Maintenance Manual Download Page 5](http://html.mh-extra.com/html/brobo/3m-series/3m-series_product-and-maintenance-manual_2817127005.webp)
1.2. Parts Checklist
Along with the drill unit, check that the following accessories, packed "loose", are included as follows:
A.
STANDARD ACCESSORIES
1) 1
Operation Manual
1.3. Minimum Requirements
For the machine to function correctly, the room in which the drill unit is to be installed must be in the vicinity of, &
satisfy the following conditions:
415/240V Power Supply
Ambient Temperature - From -10
C to +50
C.
Relative Humidity: Not more than 90%.
Lighting: More than 500 LUX.
1.4. Anchoring the Drill
Prior to anchoring the drill unit, take into considerations the requirements mentioned in
Section 1.3
&
Section
2.2
,
& other aspects regarding the usage of the machine such as accessibility to drilled parts & safe access for the
operator.
The drill unit arrives fastened to the shipping pallet using 3
M16 bolts provided. When positioning & fastening
the drill, please refer to the hole locations shown in
Figure 2
.
Figure 2.
Anchoring Hole Locations
WARNING – EXCEEDING MAXIMUM HEIGHT
Do not extend the height of the machine past the maximum ‘height installed’ indicated.
Exceeding past this limit will cause the column to extend out of the column support, which might
subsequently cause damage to the machine, as well as causing injury to any person in the
vicinity.
WARNING – OPERATING VOLTAGE VARIATION
Each drill model has an inbuilt safety system to protect it against voltage variations. However,
for the machine to perform efficiently, ensure that the drill unit operates within
10% limits of the
recommended voltage of the motor.