background image

MODEL  349BR

Page 3

6.  Cut out the shingles inside of the circle.

7.  Replace  template  over  guide  hole  and  draw  a  14 

7

/

8

"diameter circle on the black paper or roof boards using 

the smaller half of the template.

8.  Drill a large starting hole for the sabre saw just inside of 

the line.

9.  Cut out the roof board(s) inside of the line. 

Do not cut 

rafters.

10.  For proper removal of roofing nails, draw a 25 

3

/

8

" square, 

centered around the hole. Remove nails holding shingles 
down from top two-thirds of square.

11.  Slide the flashing under the shingles. Start two-thirds 

of the way down from the top of the 25 

3

/

8

" square. Do 

not bend the shingles any more than necessary. Center 
the ventilator over the hole.

Reviews: