−
Make sure that the part without the motor still can be moved ±10cm in his
bracket towards the other part, this in order to couple both parts.
−
Hang the part of the awning containing the gear box or motor into its
brackets and secure it with the bolts.
−
Roll out the awning for half a meter.
−
Hang the second part of the awning into its brackets, but first, keep the
box closed by means of a rope or securing strap around the overall cassette
−
Release the rope until the fabric of both parts is hanging at the same level.
−
Make sure that the channel in both roller tubes are in the same line and
join both parts together.
−
Fasten the second part with the bolts.
−
Join the lead rails with the coupling profile as shown on fig. 10A.
Slide the supplied legs into the lead rail and adjust the feet height according with the adjustment screw on the lower part
of the leg.
There are caravan rails provided to attach to the body of the vehicle. Set these 30mm out from the edge of the awning roof
sheet centre to centre allowing 100mm down from the cassette box to enable the panels to be fed vertically downwards.