4-2
Date of Issue: 11/2017
Document No.:
ELSA-AOI-2-1-0-US
Revision: -
4.1
Introduction
Section 4 provides checklists and recommended procedures for normal
operation of the aircraft.
4.2
Assembly and Disassembly
Refer to the BRISTELL ELSA Maintenance and inspection procedures
manual.
4.3
Pre-flight Inspection
Carry out the pre-flight inspection every day prior to the first flight or after
airplane assembly. Incomplete or careless inspection can cause an
accident. Carry out the inspection following the instructions in the Inspection
Check List.
NOTE
The word "condition" in the instructions means a visual inspection of
surface for damage deformations, scratching, chafing, corrosion or other
damages, which may lead to flight safety degradation.
Summary of Contents for BRISTELL ELSA
Page 4: ...ii Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision INTENTIONALLY LEFT BLANK...
Page 10: ...0 6 Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision INTENTIONALLY LEFT BLANK...
Page 12: ...0 8 Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision INTENTIONALLY LEFT BLANK...
Page 17: ...1 5 Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision 1 3 4 Aircraft layout...
Page 44: ...3 14 Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision INTENTIONALLY LEFT BLANK...
Page 109: ...10 4 Date of Issue 11 2017 Document No ELSA AOI 2 1 0 US Revision 10 3 Inserted Supplements...
Page 113: ......