Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Specifications
Maximum Static Pressure:
10.0 bar
Inlet Water Temperature
Min:
0.2 bar
Max:
5.0 bar
Dynamic Water Pressure
5°C
25°C
Cold Water Supply
Min:
5°C
Max:
25°C
65°C Recommended
Tools You’ll Need
Hot Water Supply
Pack Contents
65°C
150mm
Centres
15mm
Compression
Inlet Connections
Inlet Dimensions
Cavity Dimensions (mm)
25
50
Minimum
Fitting Depth:
50mm
Maximum
Fitting Depth:
75mm
Concealing Plate
Adjustment Range:
25mm
IMPORTANT
The inlet hot water must
be at least 10°C above the
required blend temperature.
Increase
Temperature
Decrease
Temperature
Draw around
the concealing
plate as a template,
measuring in by
10mm to give
clearance. Finish the
wall surface. Using a
silicon sealant, push
on the concealing
plate and hold
firmly until set.
x2
x2
x2
x2
x2
x1
x1
x1
Flat head
Screwdriver
Silicon Sealant
Hexagonal Keys
Pipe Cutter
Drill
Adjustable Spanner
Hot
Cold
4
3
2
Connect the inlet
pipes ensuring the
olives are fitted.
Screw the shrouds
onto the valve.
Pipe & Wire Detector
5
Elbows can
be point
ed up
or down
6
2.5
mm
3
1
Fit the temperature
handle back in the
maximum hot position.
Pre-set t
o
42
°
C
2
Socket Spanner
Temperature Adjustment
REMEMBER
To service
your
product!
Turn the spindle
to increase or
decrease the
temperature.
Check the
temperature and
adjust until you
achieve the
desired result.
Fit the
handles.
2.5
mm
2.5
mm
Turn the
handle to the
maximum
temperature
setting, then
remove it.
Plumb your chosen
outlets into the valve.
Turn on the water
supply and check the
valve for any leaks.
Green Flow
Limiter (Cold)
1
Valve Configuration
Remove the inlet elbows and filters.
Remove the plastic inserts from the valve
inlets and insert the flow regulators.
Replace the elbows, ensuring the
filters are fitted.
IMPORTANT
If installed in
conjunction with
combination
boiler flow
regulators
must
be
fitted.
Yellow Flow
Limiter (Hot)
1
2
Secure the valve using the screws supplied
(solid walls only) or a suitable alternative.
Installation
REMEMBER
hot on the left,
cold on the
right
Install suitable
batons (if required)
into the cavity. Take the
finished wall surface into
consideration when fitting
the valve into the cavity.
Mark the position of
the valve; drill and
plug holes to suit.
50mm
75mm
Baton
Cavity Space
Installation Instructions
& User Guide
Prior to Installation
Please leave these instructions
with the end user
All products manufactured and supplied by Bristan are safe to use
provided that they are installed, operated and receive regular
maintenance in accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999
and current by-laws. For full Installation Requirements & Notes (IRN)
please visit
wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease
of future maintenance. Before installing this product the water supply
must be thoroughly flushed in order to remove any swarf, solder etc.
Full access must be made available for future maintenance/
servicing purposes.
Before drilling into walls, check that there are no hidden electrical
wires, cables or water supply pipes. This can be checked with the
aid of an electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
This product must not be modified in any way
as this will invalidate the guarantee.
If in doubt, contact a registered plumber, your Local Water
Authority or the Secretary of the Institute of Plumbing,
address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Product Code: PM2 SHCDIV BLK (D1)