8
1020084-A
8
==================================================================================================
English Manual
x
10
ASSEMBLY
CAUTION:
GLOVES ARE REQUIRED WHEN HANDLING AERATOR TINES.
Tines have extremely sharp points. Use caution when handling.
Steps 6 & 7
Bearing (
6
)
, small end first
Tine (
5
)
Bearing (
6
)
, large end first
6
6
5
NOTE: The Bearings (
6
) have two small openings
and extensions. These are designed to sandwich the
Tines (
5
), sliding through and connecting.
5
1
12
14
6
6
2
6. Position the
10 tines (
5
) and
20 bearings (
6
)
on the tine shaft (
2
)
in the following
order:
- Bearing (
6
)
(small end first)
- Tine (
5
)
- Bearing (
6
)
(large end first)
7. Add a 5/8” flat washer (
12
) and then a square
bearing (
14
) onto the Tine Shaft between the last
bearing and the end panel. Push the square bearing
into the hole on the end plate (
1
) as illustrated here.