![Brink Renovent Excellent 300 Installation Instructions Manual Download Page 15](http://html1.mh-extra.com/html/brink/renovent-excellent-300/renovent-excellent-300_installation-instructions-manual_2812363015.webp)
Renovent Excellent
13
Installation
Chapter 5
5.1 Installation general
Installing the appliance
1. Placing the appliance (§5.2)
2. Connecting the condensate discharge (§5.3)
3. Connecting the ducts (§5.4)
4. Electric connection
Connecting the mains power, multiple switch and, if neces-
sary, the OpenTherm/eBus coupler (§5.5)
Installation must take place under:
̋" Swcnkv{"tgswktgogpvu"xgpvkncvkqp"u{uvgou"fygnnkpiu0"
̋" Swcnkv{"tgswktgogpvu"dcncpegf"xgpvkncvkqp"kp"fygnnkpiu0
̋" Vjg"tgiwncvkqpu"hqt"xgpvkncvkqp"qh"fygnnkpiu"cpf"tgukfgpvkcn"
buildings.
̋" Vjg"uchgv{"tgiwncvkqpu"hqt"nqy/xqnvcig"kpuvcnncvkqpu0"
̋" Vjg" tgiwncvkqpu" hqt" eqppgevkqp" vq" kpvgtkqt" ugygtu" kp" fygn
-
lings and residential buildings.
̋" Cp{"cffkvkqpcn"tgiwncvkqpu"qh"vjg"nqecn"wvknkvkgu0
̋" Vjg"kpuvcnncvkqp"kpuvtwevkqpu"hqt"vjg"Tgpqxgpv"Gzegnngpv0
704"Rncekpi"vjg"crrnkcpeg
The Renovent Excellent can directly be mounted to the wall
using the suspension brackets supplied for that purpose. For a
vibration-free result the appliance must be mounted to a solid
wall with a minimum mass of 200 kg/m
2
. A gypsum block or
ogvcn"uvwf"ycnn"fqgu"pqv"uwhÝeg#"Cffkvkqpcn"ogcuwtgu"uwej"cu"
double panelling or extra studs are required in that case. On
tgswguv."c"oqwpvkpi"uwrrqtv"hqt"Þqqt"oqwpvkpi"ku"cxckncdng0"Kp"
addition, the following aspects must be taken into account.
̋" Vjg"crrnkcpeg"owuv"dg"rncegf"ngxgn0"
̋" Vjg"kpuvcnncvkqp"tqqo"owuv"dg"uwej"vjcv"c"iqqf"eqpfgp
-
sate discharge with air trap and pitch for condensate can
be made.
̋" Vjg"kpuvcnncvkqp"tqqo"owuv"dg"htquv/htgg0
̋" Ocmg"uwtg"vjgtg"ku"c"htgg"urceg"qh"cv"ngcuv"92"eo"cv"vjg"
front of the appliance and a free headroom of 1.8 m for
engcpkpi"vjg"Ýnvgtu"cpf"ectt{kpi"qwv"ockpvgpcpeg0
̋" Ocmg"uwtg"vjgtg"ku"c"htgg"urceg"qh"cv"ngcuv"42"eo"cdqxg"vjg"
display cover so it can always be removed.
5.4 Connecting ducts
Vjg"ckt"gzvtcev"fwev"fqgu"pqv"jcxg"vq"dg"Ývvgf"ykvj"c"eqpvtqn"
xcnxg0"Vjg"crrnkcpeg"kvugnh"eqpvtqnu"vjg"ckt"Þqy"tcvgu0
To prevent condensation on the outside of the outdoor air sup-
ply duct and the air extract duct from the Renovent Excellent,
these ducts must be provided with an external vapour barrier
as far as the appliance. If Brink synthetic (EPE) pipe is used
here, additional insulation is not necessary.
For optimum fan noise damping, it is recommended to use
Brink acoustic ducts with a length of 1.5 m between the
appliance and the ducts from and to the dwelling.
Pay attention to crosstalk and installation noise, also for incor-
porated ducts. Design the duct with separate branches to the
valves to prevent crosstalk. If necessary, the supply ducts must
be insulated, for instance when they are installed outside the
insulated envelope.
Preferably use Brink incorporated ducts. These ducts have
been developed with a view to a low duct resistance.
A duct diameter of 180 mm is required for the Renovent Ex-
cellent,
hqt"vjg"Tgpqxgpv"Gzegnngpv"522"ecp"uwhÝeg"ykvj"c"fwev"
diameter of 150 or 160 mm.
5.3 Connecting the condensate discharge
The condensate discharge line for the Brink Renovent HR is fed
through the lower panel. The condensate must be discharged
through a drainpipe.
The condensate discharge comes separately with the applian-
ce and the installer must screw it into the underside of the ap-
pliance. This condensate discharge connection has an external
connecting diameter of 32 mm.
The condensate discharge line can be glued to it, if necessary
using a square bend. The installer can glue the condensate
discharge in the desired position in the lower part of the ap-
pliance. The drain must discharge under the water level in the
U-trap
Before connecting the condensate discharge to the appliance,
pour water into the U-trap to create an air trap.
Glued connection;
Ø32 mm
Screw connection