11
www.brikaequipment.ca
3
Replace the front panel and knobs
Replace the orifice fittings into
the valve
4
5
NOTE: UNIT NUMBER ON SIDE OF ORIFICE FITTINGS
Before installing the included convertible regulator,
unscrew the octagon cap.
You can read (NAT) on the plastic insert attached to the
head of the cap; flip it over and snap back in place.
Pictured is the plastic insert. Pull off insert from the
octagon cap head and reverse the plastic insert position so
that the L.P. position is attached to the octagon cap head.
6
Continue with installation.
Unscrew bolts and pilot valve,
then remove manifold
2
CONVERSION KIT INSTRUCTIONS FOR THE GAS COUNTER TOP HOT PLATE