![BRIGHT 8000 Base Operating, Maintenance And Spare Parts Manual Download Page 7](http://html1.mh-extra.com/html/bright/8000-base/8000-base_operating-maintenance-and-spare-parts-manual_2811756007.webp)
Issue 3 April 2011
7
1. INTRODUCTION
1.1
Receipt and Unpacking
This instrument received a final test and inspection prior to despatch from the factory. The
following instructions are given for the re-assembly of the instrument, adjustments and its
correct use. If the instrument is received before preparations for installation are completed, it
should be stored in a clean, dry place and not exposed to dirty or damp conditions.
1.1.1 Receipt
Immediately upon receipt of the instrument, make a careful examination for evidence of
damage encountered in transit. If any damage is found or suspected, notify both the carrier
and Bright Instrument Company Limited.
1.1.2 Unpacking
All packing must be carefully removed and parts checked against the enclosed packing list. If
any damage or discrepancy is noted, please inform our agent/distributor, or bright Instrument
Company Limited direct, immediately. At least two people are required during the unpacking.
When removing the main instrument from the packaging, grip the instrument on the underside
(one person to each side) and lift out the microtome. Do not lift by the sledge or attempt to
separate the sledge from the casting within the case as damage can result.
1.2 ASSEMBLY
AND
INSTALLATION
1.2.1 Positioning
The instrument should be positioned on a level, sturdy surface at a height convenient for the
operator. It may be used with its long axis parallel to the bench, at right angles or obliquely.
Ensure it has been positioned away from direct, hot sunlight and is in a location completely
free from draughts.