background image

Not for 

Reproduction

Zero-Turn Riding Mower - 48” Mower Deck

6

A

B

C

D

B

C

D

Figure 13 -  Hanger Chain Adjustment

Figure 12 -  2 x 4 Locations

 4.  Loosen the jam nut (A, Figure 11) on the clevis.

 5.  Remove the clevis pin (B) and cotter pin (C) that 

fasten the clevis (D) to the lift pivot arm.

 6.  Turn the clevis clockwise to shorten the distance 

between the rod pivots or

    counter-clockwise to lengthen the distance between 

the rod pivots.

 7.  Reinstall the clevis on the lift pivot arm and secure 

with 1/2” clevis pin and cotter pin.

 8.  Retighten the jam nut against the clevis.

 9.  Remove the blocks from under the mower deck.

 10. Remove the cutting height adjustment pin from 

in front of the deck lift pedal arm.  Lift the mower 
deck and reinstall the adjustment pin in the desired 
mowing height.

Figure 11 -  Deck Lift Rod Timing Adjustment

Deck Leveling Adjustment

Before adjusting the deck level, the deck lift rod timing 
must be checked and/or adjusted.

 1.  Park the machine on a flat, level surface.  Disengage 

the PTO, stop the engine and engage the parking 
brake.  Check tires for proper inflation.

 2.  Lock the deck lift pedal in the 4-1/2” (11,47 cm) 

position.  Place the deck height adjustment pin in the 
4” position and lower the deck lift pedal until the arm 
contacts the pin.

 3.  Place the 2 x 4 blocks under each corner of the 

mower deck with the 3-1/2” sides being vertical.  
Place a 1/4” (0,64 cm) thick spacer on top of the rear 
2 x 4’s.  See Figure 12.

 4.  Adjust the front eyebolts until the chains are tight and 

the deck is still resting on the 2 x 4’s.  Tighten the 
jam nuts.  See Figure 13.

 5.  Loosen the nuts and allow the rear of the deck to 

rest on the 2 x 4’s and 1/4” spacers.  Slide the chains 
down in the slots until the chains are tight and tighten 
the nuts.  See Figure 13.

 6.  Remove all the 2 x 4’s and spacers from under the 

mower deck.

Summary of Contents for 2900B2548

Page 1: ...times while working on or around this unit and all other outdoor power equipment Page Setup Procedure Steps to Perform 2 Uncrating Remove crate banding Disengage transmission release levers Release parking brake and roll tractor forward off skid Engage transmission release levers 2 Connect Battery Connect battery 3 Unit Assembly Assemble the ground speed control levers Assemble the seat 4 Check Fl...

Page 2: ...d to the engaged drive position D Connect Battery 1 Connect the red positive battery cable A Figure 2 to the positive battery post Make sure that the cable boot completely covers the positive terminal so that the terminal cannot cover the insulator pad B 2 Connect the black negative battery cable C to the negative battery post WARNING BATTERY SAFETY RULES Battery acid causes severe burns Avoid con...

Page 3: ...ng hardware D E F and pivot the ground speed control lever s A B forward or back to align with one another 2 Once alignment is achieved re tighten the mounting hardware HANDLE HEIGHT ADJUSTMENT 1 Remove the mounting hardware 2 Reposition the ground speed control lever either up or down from its original position and reinstall the mounting hardware 3 Perform the Handle Height Adjustment procedure H...

Page 4: ...on Oil Oil Type 20W 50 conventional detergent motor oil 1 Check the oil level when the unit is cold Raise the seat plate to gain access to the transmission oil reservoirs B Figure 8 The oil should be up to the FULL COLD mark C If the oil is below this level proceed to step 2 2 Before removing the reservoir cap make sure the area around the reservoir cap and fill neck of the reservoir is free of du...

Page 5: ...htened Torque blade mounting bolts to 70 ft lbs 94 N m Figure 9 Check Mower Blade Mounting Bolt Torque Check Deck Lift Rod Timing 1 Park the machine on a flat level surface Disengage the PTO stop the engine and engage the parking brake Check tires for proper inflation See Check Tire Pressure 2 To check the deck lift rod timing measure and record the distance between the lift pivots and the rod piv...

Page 6: ...d Timing Adjustment Deck Leveling Adjustment Before adjusting the deck level the deck lift rod timing must be checked and or adjusted 1 Park the machine on a flat level surface Disengage the PTO stop the engine and engage the parking brake Check tires for proper inflation 2 Lock the deck lift pedal in the 4 1 2 11 47 cm position Place the deck height adjustment pin in the 4 position and lower the ...

Page 7: ...ng edge to the ground Repeat this process for the other side of the machine The front measurements should be 4 10 2 cm the back measurements should be 4 1 4 10 8 cm If the measurements are greater than 1 8 3 17 mm of what they should be adjust the deck height until they are correct A A A Figure 14 Measuring the Blade Height Check Deck Drive Belt 1 Lower the mower deck to its lowest cutting positio...

Page 8: ... 7 17 8 cm If the measurement does not equal 7 17 8 cm adjust the anchor eyebolt B ADJUSTING THE MOWER BELT IDLER SPRING LENGTH 1 Loosen the jam nut C 2 Turn the adjustment nut D until a measurement of 7 17 8 cm is achieved 3 Retighten the jam nut 7 17 8 cm D C B A Figure 17 Adjusting the Mower Belt Idler Spring Length Adding Fuel To add fuel 1 Remove the fuel cap A Figure 18 2 Fill the tank to ab...

Page 9: ...omotive type high temperature lithium grease may be when this is not available Oil B control handle pivots seat plate pivots deck lift pivots discharge chute hinge Generally all the moving metal parts should be oiled where contact is made with other parts Keep oil and grease off belts and pulleys Remember to wipe the fittings and surfaces clean both before and after lubrication Lubricating the Fro...

Page 10: ...ged Operator moves ground speed control levers out of their neutral positions before disengaging parking brake Test 4 Blade Brake Check Mower blades and the mower drive belt should come to a complete stop within five 5 seconds after the electric PTO switch is turned off or the operator rises off seat If the mower drive belt does not stop within five 5 seconds see your dealer NOTE Once the engine h...

Page 11: ...on ADJUSTMENT Perform this adjustment on a hard level surface such as a concrete floor 1 Disengage the PTO engage the parking brake and turn off the engine 2 There are three nuts A on the neutral return rod The first two are to be used together to turn the neutral return rod and the third towards the front of the machine is used to lock the neutral return rod in place Loosen the jam nut that locks...

Page 12: ... to gain access to the parking brake components 3 Measure the distance from the top of the brake spring rod C Figure 21 to the top of the lock nut D on both sides of the unit The measurement should be 50 1 27 cm If not adjust the locknut to achieve the measurement of 50 1 27 cm 4 Measure the distance between the bottom of the brake shaft weldment G and the top of the set collar F The measurement s...

Reviews: