background image

10

BRIGGSandSTRATTON.COM

Controls

Other than a Manual Override lever, there are no operator
controls because this is an automatic transfer switch. The
manual override is to be used only by licensed professionals.

Operation

To select automatic transfer operation, do the following:

1. Set service disconnect switch that sends utility power

to transfer switch contactor to “

On

” position.

2. Set generator’s main circuit breaker to its “

On

” position.

3. Install 15 Amp fuse in control panel on generator.

4A. If generator is equipped with a system AUTO/OFF

switch, set switch to “

AUTO

” position.

B. If generator is equipped with a AUTO/OFF/MANUAL

switch, set switch to “

AUTO

” position.

The system will now be in automatic operation mode.

When the generator is providing power to the transfer
switch, the controller is constantly monitoring generator
power. If the air conditioner is called to run, and there is
sufficient generator power available, the controller will close
contacts “A-A” to air conditioner contactor. Contacts “B-B”
will open before contacts A-A close. If loads are too great for
generator, contacts A-A and/or B-B will open. When air
conditioning is not needed, A-A will open. If enough power is
available, B-B will close.

Testing the Automatic Transfer Switch

Turn the service disconnect feeding the transfer switch
contactor to the “

Off

” position. The automatic sequence of

the system will follow. To go back to utility power, turn the
service disconnect to the “

On

” position.

Utility Fail

The Home Standby Generator set senses when utility voltage
is below 70 percent of nominal. Engine start sequence is
initiated after 6 second time delay.

Engine Warm-Up

Time delay to allow for engine warm-up before transfer is
fixed at 20 seconds or 50 seconds with removal of jumper
on control board.

Transfer

Transfer from utility to generator supply occurs after voltage
is above set levels. Minimum engine run time is 5 minutes
after transfer.

Utility Pickup

Voltage pickup level is 80 percent of nominal voltage.

Retransfer

Retransfer from generator to utility supply is approximately
10 seconds after utility voltage supply is above pickup level
and minimum run time is completed.

Engine Cool Down

Engine will run for 60 seconds after retransfer.

Maintenance

The transfer switch is designed to be maintenance free under
normal usage. However, inspection and maintenance checks
should be made on a regular basis. Maintenance will consist
mainly of keeping the transfer switch clean.
Visual inspections should be done at least once a month.
Access to transfer switch must not be obstructed. Keep
3 feet (92 cm) clearance around transfer switch. Check for
an accumulation of dirt, moisture and/or corrosion on and
around the enclosure, loose parts/hardware, cracks and/or
discoloration to insulation, and damaged or discolored
components.
Exercise the transfer switch at least once every three months
as described in the previous section 

Testing the Automatic

Transfer Switch

unless a power outage occurs and Home

Generator System has gone through automatic sequence.
Allow generator to run for at least 30 minutes.
Contact a licensed electrical professional to inspect and clean
the inside of your transfer switch at least once a year.

Specifications

UL® 1008 Listed Transfer Switch

Model 071024

Maximum Load Current:  . . . . . . . . . . . . . . . . . . . .100 Amps

Rated AC Voltage  . . . . . . . . . . . . . . . . . . . . . . . . . .250 Volts

Poles  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Frequency  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50/60 Hz

Fault Current Rating . . . .22,000 RMS Symmetrical Amperes

Supervisory Contacts Rating:

A-A Terminals  . . . . . . . . . . . . . . . . . . . . . . . . . .24 Volt AC

B-B Terminals  . . . . . . . . . .1 Amp, 125 Volt AC, Pilot Duty

Weight  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 lbs.

Model 071025

Maximum Load Current:  . . . . . . . . . . . . . . . . . . . .200 Amps

Rated AC Voltage  . . . . . . . . . . . . . . . . . . . . . . . . . .250 Volts

Poles  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Frequency  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50/60 Hz

Fault Current Rating . . . .25,000 RMS Symmetrical Amperes

Supervisory Contacts Rating:

A-A Terminals  . . . . . . . . . . . . . . . . . . . . . . . . . .24 Volt AC

B-B Terminals  . . . . . . . . . .1 Amp, 125 Volt AC, Pilot Duty

Weight  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44 lbs.

Summary of Contents for 200010GS

Page 1: ...Home Generator Systems Installation Operator s Manual Manual No 200010GS Rev B 11 06 07 100 200 Amp Automatic Transfer Switch...

Page 2: ...C This manual contains safety information to make you aware of the hazards and risks associated with transfer switches and how to avoid them Briggs Stratton has made every effort to provide for a safe...

Page 3: ...ation 6 Unpacking 6 Mounting Guidelines 6 System Setup 7 Supervisory Control Wiring 7 Wiring Interconnections 8 Controls 10 Operation 10 Testing the Automatic Transfer Switch 10 Maintenance 10 Specifi...

Page 4: ...rds and regulations WARNING Failure to properly ground transfer switch can result in electrocution DO NOT touch bare wires or receptacles DO NOT use transfer switch with worn frayed bare or otherwise...

Page 5: ...odes and authority having jurisdiction for questions on installation Ensure generator is not overloaded with selected loads If you need more information about the transfer switch call 800 743 4115 bet...

Page 6: ...connections To prevent switch contact distortion level and plumb the enclosure This can be done by placing washers between the switch enclosure and the mounting surface NEVER install the switch where...

Page 7: ...visory control of large connected loads on generator Loads will be allowed to operate if there is enough generator power available NOTE There are two wireways provided to keep the supervisory loads se...

Page 8: ...r switch GENERATOR breaker Each conductor should pass through hole of current transformer before making connection 7 Plug in current transformer leads into CT1 and CT2 on control module 8 Connect Neut...

Page 9: ...Neutral Bus To Generator Neutral Terminal To Utility Meter Supervisory Contacts Load Connection Ground Terminal Generator Connection Utility Connection Wireways CT 1 CT 2 240V Generator Connection Ge...

Page 10: ...ansfer from utility to generator supply occurs after voltage is above set levels Minimum engine run time is 5 minutes after transfer Utility Pickup Voltage pickup level is 80 percent of nominal voltag...

Page 11: ...stop after 1 minute Generator or supervised loads air conditioner etc are operating improperly when generator is supplying power 1 A A or B B contacts not operating correctly 2 Too much load on genera...

Page 12: ...12 BRIGGSandSTRATTON COM Transfer Switch Schematic...

Page 13: ...13 13 Transfer Switch Wiring Diagram...

Page 14: ...ce Equip 23 200011GS DECAL 100A ATS 24 193159GS DECAL Reinstall Barrier 25 190992GS DECAL Warning Shock Item Part Description 26 190984GS DECAL Fuse 28 192597GS DECAL Sensing Utility 29 193450GS DECAL...

Page 15: ...ACKET Circuit Breaker 25 190992GS DECAL Warning Shock 26 190984GS DECAL Fuse Item Part Description 28 192597GS DECAL Sensing Utility 29 193450GS DECAL Breaker Circuit 30 HHS Trilobular 10 32 x 3 4 31...

Page 16: ...F YOU DO NOT PROVIDE PROOF OF THE INITIAL PURCHASE DATE AT THE TIME WARRANTY SERVICE IS REQUESTED THE MANUFACTURING DATE OF THE PRODUCT WILL BE USED TO DETERMINE THE WARRANTY PERIOD ABOUT YOUR WARRANT...

Page 17: ...Home Generator Systems Manual de Instalaci n y del Operario 100 200 Amp Automatic Transfer Switch...

Page 18: ...odos los procedimientos y m todos posibles para efectuarla No conocemos todos los riesgos y o resultados posibles de cada m todo o procedimiento Guarde estas instrucciones para futuras consultas Antes...

Page 19: ...es del Instalador 5 Descripci n del Equipo 5 Instalaci n 6 Desempaque 6 Pautas de Montaje 6 Configuraci n del Sistema 7 Cableado de Control de Supervisi n 7 Interconexiones de cableado 8 Mandos 8 Sist...

Page 20: ...s el ctricos que est n malgastados rotos pelados o da ados de cualquier forma No maneje el cables el ctricos mientras est parado en agua descalzo o cuando las manos y los pies est n mojados Si fuera n...

Page 21: ...lador Lea y observe las reglas de seguridad que se encuentran en el manual Lea y siga las instrucciones que se encuentran en este manual Consulte la normativa vigente en caso de dudas sobre la instala...

Page 22: ...firme y resistente El interruptor se debe instalar con conexiones m nimas de conduit de fo de hardware de NEMA 3R Para evitar distorsiones en el conmutador nivele la unidad si es necesario Puede hacer...

Page 23: ...rador Se pueden utilizar para el control de supervisi n de grandes cargas conectadas al generador Ejemplo acondicionador de aire calentador de agua etc Las cargas podr n funcionar siempre que la poten...

Page 24: ...ficio del transformador de corriente antes de realizar la conexi n 7 Conecte los cables secundarios del transformador de corriente a los terminales CT1 y CT2 del m dulo de control 8 Conecte el conduct...

Page 25: ...nerador Terminales NEUTRAL neutro A la Red P blica Contactos de supervisi n Conexi n de la Carga Orejetas de conexi n a tierra GND Conexi n al generador Conexi n de la compa a proveedora de electricid...

Page 26: ...ucen cuando la tensi n del equipo de reserva est por encima de los niveles especificados El tiempo m nimo de funcionamiento del motor despu s de la transferencia es de 5 minutos Recuperaci n de la Red...

Page 27: ...s Las cargas supervisadas acondicionador de aire etc no funcionan cuando se utiliza la red el ctrica 1 Los contactos A A o B B no funcionan correctamente 2 La carga del generador es excesiva 3 El tran...

Page 28: ...A EQUIPO GARANT A Esperamos que disfrute de nuestra garant a y le pedimos disculpas por las molestias causadas Cualquier distribuidor de servicio autorizado puede llevar a cabo reparaciones en garant...

Page 29: ...Home Generator Systems Guide d Installation et d Utilisation 100 200 Amp Automatic Transfer Switch...

Page 30: ...urit pour vous informer des dangers et des risques associ s aux commutateurs de transfert et la fa on de les viter La soci t Briggs Stratton a tout fait pour fournir un groupe lectrog ne dont l instal...

Page 31: ...u propri taire 5 Responsabilit s de l installateur 5 Description de l quipement 5 Installation 6 D ballage 6 Consignes d installation 6 Configuration du syst me 7 C blage de contr le 7 Interconnexions...

Page 32: ...pulez PAS les cordons d alimentation lorsque vous tes debout dans l eau pieds nus ou avec les mains ou les pieds humides Si vous devez travaillez autour d une unit alors qu elle est en marche placez v...

Page 33: ...cter les r gles de s curit d crites dans le manuel Vous devez lire et suivre les instructions indiqu es dans le pr sent le manuel V rifiez les codes f d raux provinciaux et locaux et aupr s des autori...

Page 34: ...ec les connexions de conduit de fo de mat riel de NEMA 3R minimum Au besoin nivelez le commutateur pour viter les distorsions Ceci peut tre accompli en ins rant des rondelles entre le bo tier du commu...

Page 35: ...se en marche Ils peuvent servir au contr le d importantes charges branch es la g n ratrice comme Exemple climatiseur chauffe eau etc Les charges peuvent tre activ es pourvu que la g n ratrice produise...

Page 36: ...exion 7 Branchez les fils secondaires du transformateur CT1 et CT2 au module de commande 8 Raccordez le conducteur neutre du panneau de commande de la g n ratrice la borne NEUTRAL du commutateur de tr...

Page 37: ...rre Neutre Vers la G n ratrice Terminaux Neutre Vers l Alimentation de Service Contacts de contr le Raccordement des Charges Terminaux de Mise la Terre Branchement de la G n ratrice Branchement de l l...

Page 38: ...moins 5 minutes Prise en charge de l alimentation de service La tension de prise en charge est de 80 pourcent de la tension nominale Retransfert Le transfert de l alimentation de la g n ratrice de se...

Page 39: ...p riode de refroidissement n a pas t compl t e Le moteur devrait s teindre apr s 1 minute Les charges r glables climatiseur etc ne fonctionnent pas sous l alimentation de service 1 Les contacts A A ou...

Page 40: ...OUVEZ PROUVER LA DATE INITIALE DE L ACHAT NOUS UTILISERONS LA DATE DE FABRICATION DU PRODUIT COMME DATE DE R F RENCE POUR D TERMINER LA P RIODE DE GARANTIE PROPOS DE LA QUPEMENT GARANTIE Nous accepton...

Reviews: