
Assembly
6
Remove Blowout Baf
fl
e
1. Remove and discard short blowout baf
fl
e (
A
, Figure 4),
carriage bolts (
B
) and locknuts (
C
) from mower deck (
D
).
A
C
Figure 4
B
D
C
Install Baf
fl
es
1. Determine which baf
fl
e to use. See Chart in Figure 5.
2. Lift side discharge chute (
A
, Figure 5).
3. Insert RH baf
fl
e (
B
) through discharge opening and posi-
tion baf
fl
e into place.
4. Insert carriage bolts (
C
) through left side of baf
fl
e and
secure with nuts (
D
).
5. Insert carriage bolt (
E
) through right side of baf
fl
e and
secure with nut.
6. Position LH baf
fl
e (
F
) into place.
7. Insert carriage bolts (
G
) through left side of baf
fl
e and
secure with nuts.
8. Insert carriage bolts (
H
) through right side of baf
fl
e and
secure with nuts.
44” Mower Deck
50” Mower Deck
RH
RH side 26-1/4” long
RH side 29-3/4” long
LH
LH side 24-7/8” long
LH side 27-3/4” long
RH
LH
A
B
D
C
E
D
F
G
H
D
D
D
Figure 5
Not
for
Reproduction