background image

Operating instructions

 

 

 

Loading pole with letterbox

 

 
Page 

6

 

 

 

 
Technical changes and errors                        Briefkasten Manufaktur Lippe GmbH      E-Mail: [email protected] 
Reserved. All contents are protected           Werler Straße 60                                         Phone: +49 (0)5222 807110 
by copyright.                                                     32105 Bad Salzuflen                                    Fax.: +49 (0)5222 8071129 
                                                                                                                                                     www.briefkasten-manufaktur.de

 

- The national legal requirements for electrical installations, fire protection,  
  Consider safety regulations and escape routes at the planned installation site. The    
  observe the applicable national installation regulations. 
- If necessary, each Briefkasten Manufaktur Lippe GmbH loading pole with letter box must be  
  a separate residual current circuit breaker and miniature circuit breaker in the connection 
installation  
  be protected. See requirements for the installation site 
 

WARNING  

- Before the electrical connection of the letterbox Manufaktur Lippe GmbH Brief- und  
  Make sure that the electrical connections are voltage-free. 
- Ensure that the correct connection cable is used for the electrical mains connection. 
- Die Briefkasten Manufaktur Lippe GmbH Ladestele mit Briefkasten nicht mit geöffneter  
  Leave the installation cover unattended. 
 

2.5 Safety instructions for commissioning 

 

WARNING 

- The commissioning of the Briefkasten Manufaktur Lippe GmbH charging pole with letterbox may 
only be  
  by a qualified installer and/or electrician. 
- The required correct electrical connection of the letterbox Manufaktur Lippe GmbH  
  The charging pole with letterbox must be checked by a qualified electrician before it is put into 
operation.  
  become. 
- Before commissioning the letterbox Manufaktur Lippe GmbH charging pole with letterbox on  
  check for visual damage or defects. The commissioning of a letterbox  
  Manufaktur Lippe GmbH loading dock with letterbox is not permissible. Any defects found must be  
  be reported immediately to Briefkasten Manufaktur Lippe GmbH customer service. 
 

3 Plant description 

 
The system described in these operating and installation instructions is a letterbox Manufaktur Lippe 
GmbH Ladestele with letterbox of the Designer BIG series. 
 

4 Installation and electrical connection 

 

DANGER 

It is essential to observe the safety instructions given in chapter 2, "Safety". 
 
 
 
 

4.1 Requirement for the installation area 

 

Summary of Contents for Designer BIG Charger

Page 1: ...iefkasten Manufaktur Lippe GmbH E Mail info briefkasten manufaktur de Reserved All contents are protected Werler Stra e 60 Phone 49 0 5222 807110 by copyright 32105 Bad Salzuflen Fax 49 0 5222 8071129...

Page 2: ...hting 3 1 5 Warranty and liability 4 2 Safety 4 2 1 General 4 2 2 General safety instructions 4 2 3 Safety instructions for installation 5 2 4 Safety instructions for the electrical connection 5 2 5 S...

Page 3: ...rbox pass on NOTE We would like to point out that an installation protocol must be drawn up by the installer for professional installation NOTE People with colour vision deficiencies need support in a...

Page 4: ...ten Manufaktur Lippe GmbH InstallaFon and commissioning by unquali ed personnel no installaFon and or Electrician Improper disposal after decommissioning 2 Safety 2 1 General The Briefkasten Manufaktu...

Page 5: ...nufaktur Lippe GmbH loading pole with letterbox in a potentially explosive area Ex zone Install the Manufaktur Lippe GmbH loading pole with letterbox in such a way that the plant does not block or obs...

Page 6: ...ins connection Die Briefkasten Manufaktur Lippe GmbH Ladestele mit Briefkasten nicht mit ge ffneter Leave the installation cover unattended 2 5 Safety instructions for commissioning WARNING The commis...

Page 7: ...nts for the installation of the charging pole with letterbox must be checked by a qualified electrician Depending on the country the regulations of the authorities and electricity grid operators must...

Page 8: ...anned installation site from the responsible office so that pipelines electric cables etc are not damaged NOTE Pay attention to the retraction of the cables before concreting For fastening a loading p...

Page 9: ...isk of electric shock The unit must not be cleaned with a high pressure cleaner or similar device At Mailbox Manufaktur only high quality materials are selected and processed which guarantee durabilit...

Page 10: ...be wiped away dry Powder coatings Water and small amounts of a mild cleaner can be used to clean the surface of the powder coating If absolutely necessary a small amount of turpentine substitute can a...

Page 11: ...alled they must be disposed of separately The separate collection of waste electrical and electronic equipment is intended to enable the reuse recycling or other forms of recovery of old equipment and...

Page 12: ...Lippe GmbH Werler Stra e 60 32105 Bad Salzuflen Germany Do hereby declare that Charging pole with letterbox of the following series Designer BIG Comply with requirements of the following EU Directives...

Reviews: