![Bridgeworks Oresund FCE102200 User Manual Download Page 15](http://html1.mh-extra.com/html/bridgeworks/oresund-fce102200/oresund-fce102200_user-manual_2810326015.webp)
Note:
Before powering up the FCE102200, ensure that all peripherals are
properly connected and are powered up, and that you have connected a
Management port to your network.
To turn on the FCE102200 push the switch on the opposite side to the power connector. The
following image shows the switch. Whenever the FCE102200 is powered on, the switch will be
illuminated in the colour green and system fans will be easily heard.
15
Summary of Contents for Oresund FCE102200
Page 64: ...64...