Loading the processor
To load bales on the processor:
1.
Position the processor so the back of the deck is aligned with the center of
the bale(s) you wish to load.
2.
Raise the deck until the skid shoe gently touches the ground.
3.
Back slowly under the row of bales and rotate the conveyor chain to draw
the bales up the deck, matching tractor speed to the chain speed. Let the
chain run until the first bale reaches end of the deck.
4.
Stop rotating the chain and load the first bale into the tub with the fork.
5.
Rotate the conveyor chain to draw bales up onto the deck while backing
slowly under the row of bales.
6.
Lower the fork to its home position before you load the deck with the final
bale.
7.
Lower the deck when the final bale is loaded. Allow tractor to roll forward
as you lower the deck.
TIP: Once first bale is on the deck, lower deck slightly to minimize twine
build-up on the rear pulley.
Summary of Contents for Bale King 6100
Page 40: ...Bale King 6100 Operator and Parts Manual 40 65 Gearbox Assembly ...
Page 50: ...Bale King 6100 Operator and Parts Manual 50 65 Main deck ...
Page 56: ...Bale King 6100 Operator and Parts Manual 56 65 Decal ...
Page 58: ...Bale King 6100 Operator and Parts Manual 58 65 Hydraulics Wiring Diagram ...
Page 59: ...Bale King 6100 Operator and Parts Manual 59 65 Chain Motor ...
Page 60: ...Bale King 6100 Operator and Parts Manual 60 65 Tilt Fork Deflector ...
Page 61: ...Bale King 6100 Operator and Parts Manual 61 65 Light Diagram ...
Page 62: ...Bale King 6100 Operator and Parts Manual 62 65 Diverter Diagram Machine side ...
Page 63: ...Bale King 6100 Operator and Parts Manual 63 65 Tractor Side Control Box 23988 ...