2
BRICON nv - Speedy
- Installation
•
A Speedy pack contains: Speedy with holder, one loft-antenna
and a power supply (12V) for data loger.
•
Connect the loft-antenna cable to the speedy . (the male cable-
end ,with pins ) Before connecting additional antennas they first
need to be programmed (page 10 )
•
If your installation contains more than one antenna, then
they first need to be numbered or programmed, by connecting
them one by one to the Speedy. See item : programming anten
nas for additional information. (page 10 )
•
After programming all loft-antennas, the installation can be
completed by connecting all antennas to each other. Male plug
into female plug. Assure yourself that there is a male plug point-
ing to the speedy. At the end of the installation, connect an end-
plug to close the circuit. With “antenna test” you can easily test
the installation. (page 10 )
•
When the installation is completed you can connect the trans-
former (12V) in the data logger (speedy).
•
To install the antennas in your loft, you can find an installation
guide with your antennas.