background image

BrewSculptures™ is a trademark of 

MoreFlavor!

 Inc.  This document is copy written by 

MoreFlavor!

 Inc.

Touchscreen & Connection Cables

Pos

Part Number

Description

A

SCUP840

Touchscreen Control Panel

B

SCUP424

Hot Liquor Tank Temperature Sensor & Float 
Switch

C

SCUP424B

USB Connection Cable for Digital Hot liquor 
Burner

D

SCUP414

Sparge Arm Float Switch Assembly

E

SCUP424A

Mash Tun Temp Probe

F

SCUP427

Boil Kettle Temperature Sensor

Digital Control Panel & Cables

Please note that the Digital Touchscreen Control Panel is an integral unit and does not have any parts that are 
serviceable by the end user. In the event that your control panel becomes damaged or exhibits a malfunction, 
please contact our Customer Service team to arrange for your control panel to be either repaired at our 
facility, or else replaced. 

A

B

D

E

F

Control Panel Mounting Hardware

Pos

Part Number

Description

A

H652

Stainless - T.C. Clamp (1.5 in)

B

H656

T.C. Clamp Gasket (1.5 in)

C

H658

T.C. Clamp Gasket - Teflon (1.5 in)

D

H666

Stainless - T.C. Tee (1.5 in)

E

H667

Stainless - T.C. 90 Elbow (1.5 in.)

A

B

C

D

E

Summary of Contents for 1550DV4NG

Page 1: ...BrewSculpture Digital Tippy Dump Part Number 1550DV4NG ...

Page 2: ...of 1 Hot Liquor Kettle w pre installed Maximizer 2 Stainless Ball Valve w make Quick Disconnect 3 Dial Thermometer w 2 Probe 4 Hot Liquor Tank Float Switch Temperature Probe Assembly Congratulations on your purchase of a MoreBeer Tippy Dump Brew Sculpture MoreBeer Brew Sculptures represent the very best brewhouses available to the home brewer The following pages will outline the process of unpacki...

Page 3: ...e Hot Liquor Tank installs on the remaining lowest burner on the stand 5 Install the Float Switch Temperature Sensor in the Hot Liquor Tank by hanging it over the kettle s rim Remove the silicone plug from the kettle lid s notch to accommodate the sensor s bracket Mount the Control Panel to the frame Tri Clamp connections are a type of pipe fitting used in most commercial breweries in the US The T...

Page 4: ...s activated by the control panel and a pilot light which lights the burner when the solenoid is opened As a safety feature the solenoid valve has a thermocouple which detects the presence of the pilot light if the pilot is not lit then the valve cannot open and supply gas to the burner Temperature Probes The system incorporates temperature probes in both the Mash Tun and the Hot Liquor Tank for te...

Page 5: ...n screen keypad to input your desired temperature and press the green ENT button to store the new value and return to the main screen 3 Use your finger to move the HLT slider to the HLT On position to activate the burner As long as you have sufficient water in the kettle and the pilot is lit you should see the on screen indicator for the burner as well as see and hear the flames Set up For Mashing...

Page 6: ...ith the pump turned off close the Pump Outlet Mash Tun ball valves and disconnect the hose from the Mash Tun Do your best to pinch the hose closed or fold it over to keep it as full as possible to keep from losing wort and letting air into the hose 2 Install the hose on the Hot Liquor Tank ball valve 3 Install the remaining hose on the Mash Tun ball valve and let it hang into the Boil Kettle 4 Ope...

Page 7: ...2 From the Boil Mode screen find and press the Edit Boil Timers button 3 The Total Boil Time and each Boil Addition can be set by pressing the 000 to the right of the listing to select it then changing the value with the on screen keypad Store the new value by pressing the green Enter button 4 When you have set all of the alerts that you want press the DONE button to return to the Boil Mode screen...

Page 8: ...2 for a moment to ensure it is working Check the hoses for leaks especially at the ends where the quick disconnects are held in place with hose clamps Check the pump head and valves for leaks as well 8 Program in two 1 minute mash steps at 10F 15F above the current water temperature in the Mash Tun and begin the mash Ensure that the Pump activates and stays on as necessary until the Mash Tun tempe...

Page 9: ...aximizer F H134 22 gal False Bottom G BE756G 22 gal False Bottom Gasket Hot Liquor Tank Assembly Pos Part Number Description A H602 Stainless Ball Valve 1 2 in Full Port B H503B Male Stainless Steel Quick Disconnect w MPT C MT502 Thermometer 3 in Face x 2 in Probe D AG519 Maximizer for Boil and Hot liquor Kettle A B C D E F G H A B C D E F G D A B C B A Spare Parts List While it s unlikely that yo...

Page 10: ...s Steel Quick Disconnect w MPT B H602 Stainless Ball Valve 1 2 in Full Port C MT502 Thermometer 3 in Face x 2 in Probe D AG521 Whirlpool Maximizer A B C D A B A B C D E F Pump Assembly Parts Pos Part Number Description A H503B Male Stainless Steel Quick Disconnect w MPT B H503A Female Stainless Steel Quick Disconnect w MPT C H315HF March High Temperature Brewing Pump D H602 1 2 Full Port Stainless...

Page 11: ...igital Control Panel Cables Please note that the Digital Touchscreen Control Panel is an integral unit and does not have any parts that are serviceable by the end user In the event that your control panel becomes damaged or exhibits a malfunction please contact our Customer Service team to arrange for your control panel to be either repaired at our facility or else replaced A B D E F Control Panel...

Page 12: ...the model supplied E E Do Not modify this Brew Sculpture in any way E E Do Not use an low pressure propane tank that is visibly rusty damaged or out of date E E Do Not use this Brew Sculpture while under the influence of drugs or alcohol 5 5 Always keep the black gas hose away from the flame and heated surfaces of the burner at all times 5 5 Always check for gas leaks before each use by applying s...

Page 13: ......

Reviews: