Limited Warranty
39
Step 16
Link ends of safety chains and lanyard
(attached to pin) to safety quick links.
Tighten locknuts securely with wrench.
Place hitch coupler on tongue and align
holes.
Attach coupler to Tow Leg Assembly using
(2) ½” x 3” bolts and (2) ½” Class G Flange
Nuts. Tighten Bolts to a 55 lb-ft torque.
Step 17
Attach safety chains to beam using 3/8” x 1-
1/4” Bolts and (2) 3/8” Class G Nuts.
Tighten Bolts to a 37 lb-ft torque.
3/8” nuts
Safety chains
3/8” x 1-1/4” bolts
This view is a
cross section
taken through
the center of
the tongue
and coupler