WARNING
• Make sure that mounting screws are anchored into the center of the wood joist. Use of a stud
finder is highly recommended.
• Installers are responsible to provide hardware for other types of mounting situations.
• Installer must verify that the supporting surface will safely support the combined load of the
equipment and all attached hardware and components.
Screw the
ceiling mount
onto the ceiling
4
3
2a. For Wood Joist Ceiling Mounting
1. Assembling the Ceiling Mount
B
A
C
M-H
M-H
M-F
Route the cables before installing
the ceiling mount onto the ceiling.
W-C
W-A
Drill pilot holes
2
1
3
ø 3.5
m
m
(
ø 1/8
"
)
55mm
(
2.2"
)
55mm
2.2"
(
)
45mm
(
1.8")
Summary of Contents for EPB-1
Page 1: ...2015 2 13 502874 Universal ceiling projector mount...
Page 2: ......