![Brant Radiant Heaters DET3-20-65 Manual Download Page 27](http://html1.mh-extra.com/html/brant-radiant-heaters/det3-20-65/det3-20-65_manual_2802216027.webp)
27
DET3
Series
20 Foot
50 Foot
60 Foot
30 Foot
40 Foot
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Chart 3.6
Tube Installation Sequence, Baffle Location and Secured Joints for Reflectors
Final Heater Assembly
3.0
Installation
•
Final Heater Assembly
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
NOTE:
When securing joints on reflectors
which are rotated on an angle from horizontal,
secure joint only on top side of reflector to allow
for sufficient heater expansion and contraction.
0° Mounting Angle
1 to 45° Mounting Angle
Key
Standard Tube Clamp
Stainless Steel Tube Clamp
(P/N: TP-220)
150-200 MBH models
only - Located between 1st and 2nd 10 ft.
tube sections.
Baffle Location
Burner Control Box with
16” Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
Hot-rolled Steel Radiant
Emitter Tube
Expansion Joint on
Reflectors
Secured Joint on
Reflectors