Usage to ISO containers 

 

All jacks of load capacity 5t and 10t can be used to ISO containers raising.

  

Get  the  jack by  the handle  and hang  it  on  the  container  lock. The operating  personnel  put 

the head in the corner element of the container (see Fig. 5a). 

Having  put  the  head  in  the  corner  element  of  container,  the  operating  personnel  can  start 

raising or lowering of the container (see chapter 6). 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

!  NOTICE 

Use at least two or four jack at once when raising ISO container.  
 
7.1.2  By  reason  that  the  work  with  heavy  loads  can  constitute  unexpected  hazard  it  is 

necessary to follow all „Security principles“ according to the chapter 3 of this OM. 

 

7.2 SAFETY WORK ENVIRONMENT 

 !  Warning 

(1) The operating personnel must be demonstrably acquainted with this Operation Manual; they 

must  adhere  to  valid  security  and  hygienic  regulations  and  must  be  qualified  for  operation 
of this equipment. 

(2) When  working  with  the  jack  the  operation  staff  must  be  equipped  with  gloves  and 

appropriate footwear. 

(3) When  operating  by  more  persons  always  one  worker  must  be  determined  who  is  trained 

in safety at work and is responsible for jack handling. 

(4) Before  starting  the  work,  the  operation  staff must  check up  whether  all  work  area  is  safety 

and whether there is the possibility of eventual escape from the environment of jeopardy. 

 

corner part  

jack head  

lock  

Fig. 5a 

crank-lever  

jack head  

handle  

CONTAINER 

ISO 

CONTAINER 

ISO 

Summary of Contents for 15-00-CM

Page 1: ...INTENANCE FOR RACK JACK WITH A RATCHET CRANK LEVER type 15 00 CM 5t 15 01 CM 10t Peruse the operation manual before using the jack It comprehends substantial security instructions and instructions for...

Page 2: ...APPLICATION OF THE JACK 10 7 2 SAFETY WORK ENVIRONMENT 11 8 CHECK UP ON THE JACK 12 8 1 INSPECTION 12 8 1 1 Inspections types 12 8 1 2 Daily inspection 12 8 1 3 Regular inspection 12 8 1 4 Jack occas...

Page 3: ...egulation ministerial order No 176 2008 of the Collection of Laws as amended as well as requirements of the SN EN ISO 12100 and SN EN 1494 harmonized technical standards 2 3 The jack by its design mee...

Page 4: ...or faultless technique of raising loads Hence verify all national directives regulations and standards whether they contain other information on safety work with your jack 3 2 SECURITY PRINCIPLES WARN...

Page 5: ...ons can be done that will be in accordance with producer s requirements stated in the chapter 11 of this OM IT IS NOT PERMITTED to carry out repairs and maintenance in other manner than specified by t...

Page 6: ...y special storage position 4 3 HANDLING During transportation and handling observe technical regulations and standards in force for work with heavy loads 5 MAIN TECHNICAL SPECIFICATIONS Type Load capa...

Page 7: ...or load approximating to the maximum 0 80 k 1 00 0 12 0 25 Load diagram Load diagram Load diagram Load diagram 1 2 3 4 Percentage of operating time 5 2 MATERIAL AND FINISH 5 2 1 All parts of the jack...

Page 8: ...he jack see chapter 6 5 ALWAYS safeguard the jack against drop at pushing or spreading out of loads i e in horizontal direction A drop can take place when shifting the load and thereby unloading and r...

Page 9: ...through of the brake namely at manipulation with heavier loads In this case release the brake by more point blank motion thereby you will coincidently release the ratchet crank 6 3 RATCHET CRANK LEVER...

Page 10: ...suitable load 10 till 50 of the load capacity At the same time verify whether the jack will hold firmly the load without slipping when lowering and stopping 7 OPERATION 7 1 APPLICATION OF THE JACK 7 1...

Page 11: ...s according to the chapter 3 of this OM 7 2 SAFETY WORK ENVIRONMENT Warning 1 The operating personnel must be demonstrably acquainted with this Operation Manual they must adhere to valid security and...

Page 12: ...inspection also during operation in the interval between regular inspections Qualified employees will determine whether any defect or damage can constitute a hazard and whether the detailed inspectio...

Page 13: ...r inspection carried out by the competent person Part Inspection method Limit criteria for putting out of operation Remedy 1 Fixative parts Visual inspection of all screws nuts rivets etc Faulty or mi...

Page 14: ...ASING 10 1 GENERALLY Before application of the grease remove old grease clean up components with grease solvent and apply new grease Use grease specified by the producer vaseline lubricant grease PM A...

Page 15: ...rying out the maintenance see chapter 6 5 ALWAYS mark disabled or repaired jack with appropriate inscription i e OUT OF OPERATION NEVER carry out maintenance if there is the load on the jack NEVER wor...

Page 16: ...e heat fire as the mean when dismantling parts if the parts are destined for next use 5 Keep the workplace clean and without foreign materials that could get into bearings and other movable parts 6 If...

Page 17: ...Law as amended EP and Council directive 2014 34 EU SN EN ISO 12100 SN EN 1494 SN EN 1127 2 SN EN 1127 1 SN EN 13463 1 Regulation of CBM Czech Bureau of Mine No 22 89 of the Collection of Law SN 33 20...

Page 18: ...destined entirely for underposable raising and lowering of free loads at normal atmospheric conditions in the workplace when observing the specified maximum load capacity Is in conformity with the fol...

Reviews: