![Braeburn 140303 Installer'S Manual Download Page 8](http://html1.mh-extra.com/html/braeburn/140303/140303_installers-manual_2800587008.webp)
4
Configuration
Use the following instructions to configure the 3 Zone Control Panel.
1. Open J1 jumper for dual transformer installations.
2. Open J2 short cycle protection jumper for system test.
Note:
Replace J2 when system testing is completed or leave J2 open if compressor has built in
short cycle protection.
3.
Press
▲
and then press
▲
to raise or
▼
to lower the Hi Temp cutout.
4.
Press
▼
and then press
▲
to raise or
▼
to lower the Low Temp cutout.
5. Press
▲
and
▼
at the same time to adjust purge time. Press
▲
to raise or
▼
to lower the
purge time.
Figure 4
8
▲
▲
RH
RC
Y1
Y2
G
G2
W1
AUX
W2
O/B
C
HI/LOW LIMIT
CUTOUT ADJUST
J2-SHORT CYCLE
PROTECTION
EQUIPMENT
Braeburn
3-Zone
JI REMOVE TO SEPARATE
RH AND RC TERMINAL
SUPPLY TEMP
HI TEMP
LO
TEMP
PURGE
DELAY
J2 jumper
J1 jumper
HI/LOW
temp cutout
adjustment