
E-3
Transfer Printer THT-BP Precision
1
8
9
10
8
11
6
6. Carefully unplug the printhead (
1
) from the connectors of the printhead
cables (
9 and 10
).
7. Connect the new printhead to the cables.
8. Place the printhead into the assembly and insert the holes (
8
) onto the
pins (
11
).
9. Tighten the locking screw (
5
) by hand. Check that the printhead is
completely secured in the printhead carriage.
10. Swing the lever (
6
) again into the position shown in figure E-2.
11. Tighten the locking screw (
5
) completely. Do not over-tighten the locking
screw (
5
).
Fig. E-3 Changing Printhead (II)
Appendix E - Replacing Assembly Units
Summary of Contents for THT-BP Precision
Page 1: ...Edition 2 05 Transfer Printer THT BP Precision Operator s Manual...
Page 51: ...51 Transfer Printer THT BP Precision This page is intentionally left blank 7 Media Loading...
Page 73: ...73 Transfer Printer THT BP Precision A B D C E F 9 Test Options Fig 9l Status Print...
Page 79: ...79 Transfer Printer THT BP Precision 9 Test Options Fig 9o Printhead Profile...
Page 83: ...83 Transfer Printer THT BP Precision 9 Test Options Fig 9s Test Grid...