![Bradley TDB3105 Installation Manual Download Page 4](http://html.mh-extra.com/html/bradley/tdb3105/tdb3105_installation-manual_2800012004.webp)
TDB3105
Installation
4
1/15/2013
Bradley • 215-1563 Rev. E; ECN 12-00-004
(mm)
Rough-In Specifications
Type A
Off-line vent with
supplies from below
8-1/2"
(216)
4-1/4"
(108)
1-5/8"
(41)
1/2" Nominal Copper
Tubing for Supplies
Through Floor, Stub Up
2-1/2" (64) Above Floor
Cold
Hot
4-1/8"
(105)
2" NPT Drain,
Stub Up 3" (76)
Above FLoor
2"
(51)
4-3/4"
(121)
3-7/8"
(98)
5"
(127)
Suggested
Electrical Outlet
Location
36" (914) Bowl
Type B
Centrally rising vent with
supplies from above
1/2" Nominal
Copper Tubing,
Supplies from
Above
7/8" (22)
7/8" (22)
Cold
1-1/2" NPT
Vent to Ceiling
1-5/8"
(41)
1-1/4"
(32)
5"
(127)
Suggested
Electrical Outlet
Location
3-7/8"
(98)
4-1/4"
(108)
8-1/2"
(216)
4-1/8" (105)
2" NPT Drain,
Stub Up 3" (76)
Above Floor
36" (914) Bowl
Hot