background image

9

Installation 

S19-324D1

Bradley • 

215-1848 Rev. G: ECO 20-05-028 

6/11/2020

S19-324D1 Service Parts

30

32

31

32

33

34

37

34

38

76

84

62

34

33

34

20

38 77

63

61

41

43

32

33

34

39 36

34

37

34

36

33

34

2

1

60

64 65

38

84

36 81

80

61

62

3

84

Summary of Contents for S19-324D1

Page 1: ...n Proof Emergency Signaling System Table of Contents Pre Installation Information 2 3 Assembly of Components 4 Install the Flow Switch and Mount Signaling Assembly 5 Connect Signaling Assembly to Flow...

Page 2: ...eginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall be...

Page 3: ...require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment buil...

Page 4: ...Sensor Body Brass Adapter and Tee 2 7 8 73mm 1 5 8 41mm NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 13 16 97mm 5 5 16 135mm Red Blue Black Remote Sensing 13 1 8 334mm System is...

Page 5: ...m may be mounted directly to the drench shower piping using the supplied U bolts and nuts The signaling system can also be bolted to a flat surface such as a wall hardware for this type of installatio...

Page 6: ...clockwise and sealing the control box The cable may be cut to any length required A Wire the flow switch to the control box with one of the provided cables and conduit hubs supplied per the wiring sch...

Page 7: ...ill automatically reset the silence feature The signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The signaling system will continue to o...

Page 8: ...that water flow is sufficient 2 4 gallons per minute is required Installation error Check all electrical connections including power supply at the quick connect cable from the signal station to the fl...

Page 9: ...9 324D1 Bradley 215 1848 Rev G ECO 20 05 028 6 11 2020 S19 324D1 Service Parts 30 32 31 32 33 34 37 34 38 76 84 62 34 33 34 20 38 77 63 61 41 43 32 33 34 39 36 34 37 34 36 33 34 2 1 60 64 65 38 84 36...

Page 10: ...Surface Mount 60 140 1157 1 Plate PM Pipe Mount 60 S70 176 1 Mounting Plate Heat Trace Item Part No Qty Description 61 160 514 5 Screw 3 8 16 x 1 0 BTNCA 62 161 157 5 Nut 3 8 16 Hex Jam 63 140 1158 1...

Reviews: