4
4/9/2020
Bradley •
215-1857 Rev. E: ECO 19-05-034B
S19-304D2, S19-304C2
Installation
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-052
Signed
Signed
Signed
Date
Date
Date
Signed
Unterschrift
Signe
Date
Datum
Date
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Prepack S45-1535
Safety Sign
(qty. 2)
Hook
(qty. 2)
Emergency Tag
Hex Nut #10-24
(qty. 2)
Screw #10-24 x 1/2"
(qty. 2)
Pull Rod
128-156A
128-157 (316 SS)
Stainless Steel
Showerhead
Plastic
Showerhead
Heat Trace Unit
S19-304T (top supply)
S19-304B (bottom supply)
Optional Shower
Shroud and
Retaining Nut
Optional Foot Pedal Kit
S45-572 or S45-1314SS16
Components
NOTICE! Bottom supply units have provisions for supporting the top of the unit. The 1-1/4" NPT solid pipe
protruding from the shell must be used to support the unit.
Supplies Required
• (3) 3/8" floor anchors and bolts
• Teflon tape and pipe sealant
• 30 PSI (2.0 bar) min/90 PSI (6.1 bar) max flow pressure
• 125 PSI (8.6 bar) max static pressure
• Piping to 1-1/4" NPT water supply inlet (30-90 PSI/2.0-6.1 bar)
• Piping to 1-1/4" NPT drain outlet on unit (if included with unit)
• Adequate supply pipe supports
• Provisions to dispose of shower and eye or eye/face wash waste water (minimum 30 gallons/115 liters)
should be made (minimum 4"/120mm drain)
• Optional: sign-mounting hardware
• Optional: for extension cable option, pipe insulation and protective coating are required