S19-270C, S19-270E
Installation
10/30/2012
Bradley •
215-1326 Rev. P; ECN 12-05-003C
Installation
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
•
Piping to ½" NPT water supply inlet on unit
•
Sign-mounting hardware
The unit is pre-assembled for right-hand mounting. If left-hand mounting is desired, the unit must be disassembled and the
parts reassembled as shown.
Step 1: Attach eyewash
The top of the eyewash heads should be positioned a maximum of 45" from the floor.
1. Select the desired location for the eyewash on the sink deck and drill a
⁷⁄₈
" diameter hole.
2. Secure the assembled unit to the deck with the nut and washer provided as shown on page 5.
Step 2: Connect water supply
1. Connect the water supply using flexible hose (supplied by installer) with ½" NPT threaded end.
2. Mount the safety sign to wall or pipe using sign-mounting hardware supplied by installer.
3. Open the water supply lines. Test for leaks and adequate water flow.
Position the
directional insert
as shown.
Position the bent pipe and
head assembly as shown.
Reseal the threaded
ends of the bent pipe as
required.
S19-270C is shown; S19-270E is
reassembled in the same manner.
Left-Hand Mounting