background image

2

S19-220FW, S19-220T

Installation

4/20/07

Bradley Corporation • 215-158FW Rev. J; EN 06-532E

WARNING

Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the
installer.

Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin
installation until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to
the eyewash should be “ON” at all times. Provisions shall be made to prevent
unauthorized shutoff.

The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per
ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to
ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment
per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit
www.bradleycorp.com or call 1-800-BRADLEY.

Product warranties may also be found under ”Product Information” on our web
site at www.bradleycorp.com.

Installation

TH

IS

SID

E

UP

Packing List

!

!

!

!

P

.O

. B

ox

 3

09

, M

en

om

on

ee

 F

alls

, W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Test-operate valve(s) each week and sign below

.

R

eport any m

alfunctions imm

ediately.

Ven

til(e) w

öche

ntlich im

 Testbe

trieb prüfen

, bestätig

durch U

ntersch

rift. Jeg

liche Störung sofort m

eld

en. 

Date

Datum

Date

Signed

Unterschrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

Ä

1S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Test le fonctionnem

ent des va

lves chaque se

m

ain

e et 

signe en bas. S

'il y à quelque chose q

ui ne va pas fait  

un rapport im

médiatem

ent. 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-220FW

Page 1: ...Stainless Steel Bowl Douche oculaire faciale murale avec cuvette en acier inox Lavador de ojos rostro para montaje en pared con recipiente de acero inoxidable Table of Contents Pre Installation Inform...

Page 2: ...to verify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained reg...

Page 3: ...page 5 Apply pipe sealant supplied by installer to all male threaded pipe joints Use a strap wrench around pipes when tightening to prevent marring Step 3 Connect water supply 1 Connect the water sup...

Page 4: ...LEY FAX 262 251 5817 http www bradleycorp com 114 051 1 5 1 4 1 3 1 2 1 1 3 5 9 7 5 1 6 1 2 IPS Supply Inlet 10 4 8 1 1 4 IPS Drain Outlet 1 2 3 2 1 2 2 2 Figure 2a NOTE Items 1 1 1 5 come preassemble...

Page 5: ...ww bradleycorp com 114 051 1 5 1 4 1 3 1 2 1 1 3 5 9 7 5 1 6 1 2 IPS Supply Inlet 10 4 8 1 1 4 IPS Drain Outlet 1 2 3 2 1 2 2 2 Figure 2b NOTE Items 1 1 1 5 come preassembled as Item 1 Items 2 1 2 3 c...

Page 6: ...les dates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dange...

Page 7: ...fourni par l installateur tous les joints de tuyaux filet s m les Lors du serrage utiliser une cl courroie sur les tuyaux afin d emp cher le marquage des tuyaux tape 3 Raccorder l approvisionnement en...

Page 8: ...1 4 IPS Drain Outlet 1 2 3 2 1 2 2 2 Figure 2a DRAIN DE SORTIE 1 1 4 IPS Note Les l ments 1 1 1 5 arrivent pr assembl s comme l l ment 1 Les l ments 2 1 2 3 arrivent pr assembl s comme l l ment 2 APPR...

Page 9: ...1 2 2 2 Figure 2b DRAIN DE SORTIE 1 1 4 IPS Note Les l ments 1 1 1 5 arrivent pr assembl s comme l l ment 1 Les l ments 2 1 2 3 arrivent pr assembl s comme l l ment 2 APPROVISIONNEMENT L ENTR E 1 2 IP...

Page 10: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que p...

Page 11: ...de ojos como se indica en la Figura 2a p gina 12 o Figura 2b p gina 13 Aplique sellador de tubos proporcionado por el instalador a todas las uniones de los tubos macho roscados Use una llave de cinta...

Page 12: ...10 4 8 1 1 4 IPS Drain Outlet 1 2 3 2 1 2 2 2 Nota Las piezas 1 1 1 5 vienen preensambladas como Art culo 1 Las piezas 2 1 2 3 vienen preensambladas como Art culo 2 Figura 2a SALIDA DE DRENADO 1 1 4...

Page 13: ...8 1 1 4 IPS Drain Outlet 1 2 3 2 1 2 2 2 Nota Las piezas 1 1 1 5 vienen preensambladas como Art culo 1 Las piezas 2 1 2 3 vienen preensambladas como Art culo 2 Figura 2b SALIDA DE DRENADO 1 1 4 IPS E...

Reviews: