Bradley S19-220DC Installation Manual Download Page 7

7

Installation

S19-220DC

Bradley Corporation • 215-158DC Rev. K; EN 06-532E

4/17/07

Assemblage des composantes

P.O. Box 

3

09, Menomonee Fall

s

, WI 5

3

051

R

TE

S

T THI

S

 UNIT EACH WEEK

Te

s

t-operate valve(

s

) each week and 

s

i

g

n below.

Report any malfunction

s

 immediately.

Ventil(e) wöchentlich im Te

s

tbetrieb prüfen, be

s

täti

g

durch Unter

s

chrift. Je

g

liche 

S

törun

g

 

s

ofort melden. 

Date
Datum
Date

S

i

g

ned

Unter

s

chrift

S

i

g

ne

Date
Date

Date

S

i

g

ned

S

i

g

ned

S

i

g

ned

DIE

S

E

S

 GERÄT 1

S

T WÖCHENTLICH ZU PRÜFEN.

E

SS

AI HEBDOMADAIRE

Te

s

t le fonctionnement de

s

 valve

s

 chaque 

s

emaine et 

s

i

g

ne en ba

s

S

'il y à quelque cho

s

e qui ne va pa

s

 fait  

un rapport immédiatement. 

P.O. BOX 

3

09, MENOMONEE FALL

S

, WI 5

3

052-0

3

09 U

S

A

TEL: 1-

8

00-BRADLEY    FAX: (262-251-5

8

17)

http://www.bradleycorp.com

114-051

1.9

1.5

Flow Control

Thi

s

 End

1.4

1.

3

1.2

1.1

2

4.1

6

4.

3

4.11

4.2

1/2" IP

S

S

upply Inlet

1

7

3

5

1-1/4" IP

S

Drain Outlet

4

1.

8

HANDLE NOTE: 

Clo

s

e the cover and

put the pin throu

g

h

the clip to keep clo

s

ed.

1.6

1.7

4.4

Figure 2  

1

S90-300

1

Assemblage du récepteur avec
couvercle anti-poussières

1.1

111-061

1

Raccordement d’entrée du drain

1.2

124-028

1

Joint d’etanchéité

1.3

S90-009

1

Couvercle anti-poussières

1.4

173-009

1

Filtre à tamis

1.5

S21-071

1

Tige d’alimentation

1.6

113-1159

1

Entretoise

1.7

S05-091

1

Assemblage de cadre

1.8

269-447

1

Butoir

1.9

161-025

1

Écrou hexagonal

2

113-006LQ

1

Tuyau 1/2" NPT x 9 cm (3-1/2 po)

3

169-025

1

Coude 

4

S30-072

1

Trousse Préemballée robinet de 1/2
po et poignée 

4.1

S27-282

1

Robinet 1/2 po (avec écrou)

4.11

110-215

1

Écrou (seulement)

4.2

S08-056

1

Assemblage de poignée

4.3

142-002DA

1

Rondelle de sécurité

4.4

153-372R

1

Adapteur

5

269-167

1

Raccord droit de vidange

6

114-051

1

Enseigne de sécurité

7

204-421

1

Etiquette d’inspection

Piéce

Réf

Qté

Description

Piéce

Réf

Qté

Description

CONTRÔLE DU

DÉBIT, CE BOUT

DRAIN DE SORTIE

(1-1/4 IPS)

Note : Les éléments 1.1-1.9 arrivent préassemblés comme l'élément 1.

APPROVISIONNEMENT

À L'ENTRÉE (1/2 IPS)

REMARQUE : Fermer le

couvercle et tirer la goupille

au travers du clip pour le

conserver fermé.

Paquet S30-

0

87 comprend les éléments 4.11, 4.2, 4.3, 4.4

Paquet S45-1782 comprend les éléments 1.2, 1.4, 1.5, 6

Summary of Contents for S19-220DC

Page 1: ...ercle anti poussi res Lavador de ojos para montaje en pared con cubierta guardapolvo Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 4...

Page 2: ...erify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regardin...

Page 3: ...ations see Figure 1 3 Bolt the inlet drain fitting to the wall or wall fasteners using 3 8 bolts supplied by installer Step 2 Assemble eyewash components 1 Assemble eyewash components as shown in Figu...

Page 4: ...4 1 3 1 2 1 1 2 4 1 6 4 3 4 11 4 2 1 2 IPS Supply Inlet 1 7 3 5 1 1 4 IPS Drain Outlet 4 1 8 HANDLE NOTE Close the cover and put the pin through the clip to keep closed 1 6 1 7 4 4 Figure 2 NOTE Items...

Page 5: ...dates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereus...

Page 6: ...taches murales avec des boulons 3 8 po fournis par l installateur tape 2 Assemblage des composantes de la douche oculaire 1 Assembler les composantes restantes de la douche oculaire tel qu indiqu la F...

Page 7: ...gure 2 1 S90 300 1 Assemblage du r cepteur avec couvercle anti poussi res 1 1 111 061 1 Raccordement d entr e du drain 1 2 124 028 1 Joint d etanch it 1 3 S90 009 1 Couvercle anti poussi res 1 4 173 0...

Page 8: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que p...

Page 9: ...pared o f jelo en la pared usando los soportes de pared y pernos de 3 8 proporcionados por el instalador Paso 2 Armado de los componentes del lavador de ojos 1 Arme los componentes restantes del lava...

Page 10: ...1 6 1 7 4 4 1 S90 300 1 Conjunto del recipiente con cubierta guardapolvo 1 1 111 061 1 Acceso de entrada de drenado 1 2 124 028 1 Empaque 1 3 S90 009 1 Cubierta guardapolvo 1 4 173 009 1 Filtro de cop...

Reviews: