3
Installation
S19-130SS
Bradley •
215-292 Rev. F; ECN 12-05-016G
11/12/2012
Installation
Supplies Required:
•
Pipe sealant
•
Piping to 1" NPT water supply inlet
•
Adequate supply pipe supports
•
Minimum 4" (102 mm) drain to
accommodate 30 gallons (115 liters) per
minute discharge for shower waste
•
Sign-mounting hardware
Step 1: Assemble components
1. Assemble components as shown on page 4.
•
Apply pipe sealant (supplied by installer)
to all male-threaded pipe joints.
•
The bottom edge of the showerhead
should be 84" (2134 mm) from the floor.
Step 2: Connect water supply
IMPORTANT! Do not rely on Bradley’s Drench
Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer)
for supply pipe using pipe hangers or other
means.
2. Mount the safety sign to the wall using sign-
mounting hardware supplied by installer.
9"
(229mm)
84"
(2134mm)
Suggested
Height to
Floor
25-1/2"
(648mm)
6"
(152mm)
7-3/4"
(197mm)
Ø 1-1/2"
(38mm)
All dimensions assume standard thread
engagement. Variations in manufacturing allow
for +/-
¹⁄₈
” (3mm) per threaded joint. To find
the tolerance of a dimension, add the number
of thread joints in between a dimension and
multiply it by
¹⁄₈
” (3mm).