background image

S59-4007 

Installation

2

 

2/1/2018

 Bradley 

• 215-1852 Rev. C; ECN 18-09-011

WARNING

Failure to comply with proper installation and maintenance instructions could contribute to the valve failure 
resulting in severe bodily injury including scalding, chilling, and/or death depending upon system water 
pressure changes and/or supply water temperature changes.  

Use this Thermostatic Mixing Valve in accordance with ASSE standard 1070. This valve does not provide 
protection from pipe freezing.

Output temperature of the valve must be checked and adjusted at initial installation and on a quarterly basis.

Make sure that all water supply lines have been flushed and then completely turned off before beginning 
installation. Debris in supply lines can cause valves to malfunction.

NOTICE

Regular checking and cleaning of the valve’s internal components is necessary for maximum life and proper 
product function. Periodic inspection and yearly maintenance by a licensed contractor is required. Corrosive 
water conditions, and/or unauthorized adjustments or repairs could render the valve ineffective for its 
intended service.  Frequency of cleaning and inspection depends upon local water conditions.

IMPORTANT

Read this entire installation manual to ensure proper installation. When finished with the installation, file 
this manual with the owner or maintenance department. Compliance and conformity to local codes and 
ordinances is the responsibility of the installer.

Consult local building and plumbing codes prior to installation. Should these codes differ from the 
information in the Manual, follow the local codes.  Inquire with governing authorities for additional local 
requirements.

Separate parts from packaging and make sure all parts are accounted for before discarding packaging 
material. If any parts are missing, do not begin installation until you obtain the missing parts.

Product warranties may be found under “Products” on our web site at bradleycorp.com.

Supplies Required

•  Shut-off on the outlet if tempered water is 

supplied to a remote location

•  Shut-off on the inlets/supplies
•  (2) #10 fasteners (and wall anchors, if 

necessary) for wall bracket

Tools Required

•  Adjustable Wrench
•  Needle-Nose Pliers
•  Phillips-Head Screwdriver

Summary of Contents for Navigator S59-4007

Page 1: ...ation 2 Supplies and Tools Required 2 Installation 3 Troubleshooting 4 Parts List 4 Inlet Connections 1 2 NPT Outlet Connection 1 2 NPT Temperature Range 95 125 F Maximum Pressure 125 PSIG Inlet Temperature Hot 120 180 F Inlet Temperature Cold 33 80 F Minimum Temperature Differential from valve set point 10 F ASSE 1070 cUPC certified 215 1852 Rev C ECN 18 09 011 2018 Bradley Page 1 of 4 2 1 2018 ...

Page 2: ...and or unauthorized adjustments or repairs could render the valve ineffective for its intended service Frequency of cleaning and inspection depends upon local water conditions IMPORTANT Read this entire installation manual to ensure proper installation When finished with the installation file this manual with the owner or maintenance department Compliance and conformity to local codes and ordinanc...

Page 3: ...t Supply Lines 3 Adjust Temperature with Water Running A Loosen cap screw about 1 4 4 6 turns and lift up cover do not remove B Using cover turn cartridge gently until desired water temperature is reached Do not turn past stops as this may damage unit Push cover down and tighten screw 4 Test Unit 1 Assemble the Valve A Install check valves into valve assembly as shown in the Parts List Observe dir...

Page 4: ...per water temperature or temperature fluctuation Hot water supply is not 10 above desired set point Increase hot water supply temperature Valve temperature is not properly set Adjust the temperature as shown on page 3 step 2 Limited water flow Dirt and debris have built up in the valve or strainer 1 Check to make sure both hot and cold supplies are connected to the Navigator mixing valve and that ...

Reviews: