Pre-Installation Information
Tools required
• Tape measure
• Power drill
• 3/16" drill bit
• 1/4" masonry drill bit
• Phillips driver bit
Hardware List (hardware provided by Bradley)
2
Lenox Lockers™ Pedestal Bench
Installation
9/29/06
Bradley Corporation • LK-INSTR-003 Rev. A; EN 06-1309
FAST-LF017
1/4" x 2-1/4" lg. stud with nut and washer for
securing pedestal to the floor
FAST-S357
#14 x 1-3/4" lg. screw for attaching pedestals to
the bench
IMPORTANT!
Read this entire installation manual to ensure proper installation. When finished with the
installation, file this manual with the owner or maintenance department. Compliance and
conformity to local codes and ordinances is the responsibility of the installer.
Separate all parts from the packaging and make sure all parts are accounted for before
discarding packaging material. If parts are missing, do not begin installation until you
obtain the missing parts.
Accuracy is important when drilling the flange holes.
Review your layout drawings and verify the number of pedestal benches and
components before beginning installation. Refer to your submittal layouts for proper
placement of the pedestal benches.
Make sure all floors are clean and smooth. Remove loose impediments, such as
protruding nails, and other debris which could affect installation. The bench will be as
level as the floor it is secured to. Do not use shims to level the pedestal bench.
Product warranties may be found under "Product Information" on our web site at
www.bradleycorp.com.
TH
IS
SID
E
UP
Packing List
Installation
.
STD. HANDLE - VENT
.
SEE BOM
LOCKER ASSEMBLY
LK187218-1HV
.
.
NTS
SAME
11/30/01
.
.
.
TAM
.
.010
.015
2˚
.015
APP.
CHANGE
DATE
NO.
C/N
DR.
DRAWN BY
DO NOT
MATERIAL SPEC.
DRAWING
SCALE
PART NO.
NAME
TOLERANCES-
+
3 PLACE
ANGLES
FRACTIONS
2 PLACE
- +
-
+
-
+
-
SPECIFIED:
OTHERWISE
UNLESS
USED ON
REFERENCE
ACAD #
SCALE
DATE
FIRST
DATE
DATE
APPR'D
CH'K'D