background image

S59-1005SR 

Installation

2

 

1/8/2020

 Bradley 

• 215-1674 Rev. F: ECO 19-03-024

Safety Information 

To ensure proper operation: 

Installation 

Failure to comply with proper installation and maintenance instructions could contribute to a valve failure resulting in severe bodily 
injury including scalding, chilling, and/or death depending upon system water pressure changes and/or supply water temperature 
changes .
Hot limit screw is set in the maximum temperature position . Failure to properly adjust may result in serious scalding . This valve 
may not protect from scalding if there is a failure of other temperature-controlling devices elsewhere in the plumbing system . 
Excessive heat may cause damage to internal parts .
This valve is intended to be installed as an ASSE 1016 valve- at the point of use, where the user has access to flow or final 
temperature controls . This valve should not be used where an ASSE 1017, ASSE 1069, or ASSE 1070 device is required .
Make sure that all water supply lines have been flushed and are then completely turned off before beginning installation . Debris in 
supply lines can cause valves to malfunction .
Installation of this system must be completed by a qualified plumber in compliance with all national and local codes . Compliance 
and conformity to local codes and ordinances is the responsibility of the installer . Should these codes differ from the information in 
the manual, follow the local codes . Inquire with governing authorities for additional local requirements .

Inspection 

Regular checking and cleaning of the valve's internal components and check stops is necessary for maximum life and proper 
product function . Periodic inspection and yearly maintenance by a licensed contractor is required . Corrosive water conditions 
and/or unauthorized adjustments or repairs could render the valve ineffective for its intended service . Frequency of cleaning and 
inspection depends upon local water conditions .

Supplies Required:

•  Teflon Tape
•  Allen key wrenches
•  Screwdriver
•  1/2" NPT Brass pipe plug
•  Adjustable wrench
•  100% Silicone Sealant
•  Semi-Permanent Threadlocker
•  Security sealant (if required)
•  Silicone Grease (supplied)

Summary of Contents for Equa-Flo S59-1005SR

Page 1: ...ve and Adjust Valve Temperature 4 Attach Escutcheon and Handle 4 Read the instructions in this manual before beginning installation Save these instructions and refer to them for inspection maintenance and troubleshooting information For questions regarding the operation installation or maintenance of this product visit bradleycorp com or call 800 BRADLEY 800 272 3539 Product warranties and parts i...

Page 2: ...water supply lines have been flushed and are then completely turned off before beginning installation Debris in supply lines can cause valves to malfunction Installation of this system must be completed by a qualified plumber in compliance with all national and local codes Compliance and conformity to local codes and ordinances is the responsibility of the installer Should these codes differ from ...

Page 3: ...ey Representative and ask for S45 2264 Back to Back Rotor Kit to swap out the rotor on the reversed side Back to Back Installation 6 1 2 165 w Stops 2 1 2 64 w o Stops Hot Cold 1 3 4 46 mm Rough in 1 WARNING In order for the shower to be ligature resistant the valve inlet and outlet rough ins must be 4 1 8 2 1 8 53 1 1 2 38 1 1 2 38 48 1219 Above Finished Floor 2 1 4 56 4 103 4 5 8 119 Finished Wa...

Page 4: ...ws are tightened equally WARNING The temperature limit stop has been factory preset for maximum temperature operation Failure to adjust the limit screw to a safe shower temperature could result in the user being scalded Connect Valve and Adjust Valve Temperature 2 Attach Escutcheon and Handle 3 D Apply 100 silicone caulk to all screw backsides prior to escutcheon installation A Slide handle over s...

Reviews: