background image

Installation

 S59-1005

Bradley • 215-1492 Rev. E; EN  12-03-009 

8/7/2012 

3

If the Rough-in Shield is used, remove the shield before 
installing the escutcheon and handle.

A

Position valve with port labeled “UP” towards showerhead. 
Connect valve to hot and cold supplies and showerhead or 
tub spout supplies (see rough-in diagram.)

B

Turn on hot and cold supplies to pressurize valve and check for 
leaks. (Valve will not operate unless both hot and cold supplies 
are turned on.) Adjust maximum temperature by turning set 
screw on valve cap.

C

H

1/4"

1/4"

UP

A

Place the escutcheon and handle on the 
wall over the valve and secure with the 
screws provided.

The included foam rim seal may be applied to the back of 
the escutcheon 1/4" from the outer edge, with the seam 
at the bottom.

WARNING!  The temperature limit stop has been factory 

preset for maximum temperature operation. 
Failure to adjust the limit screw to a safe 
shower temperature could result in the 
user being scalded.

Connect Valve and Adjust Valve Temperature

2

Attach Escutcheon and Handle

3

Reviews: