Installation
S59-1005
Bradley • 215-1492 Rev. E; EN 12-03-009
8/7/2012
3
If the Rough-in Shield is used, remove the shield before
installing the escutcheon and handle.
A
Position valve with port labeled “UP” towards showerhead.
Connect valve to hot and cold supplies and showerhead or
tub spout supplies (see rough-in diagram.)
B
Turn on hot and cold supplies to pressurize valve and check for
leaks. (Valve will not operate unless both hot and cold supplies
are turned on.) Adjust maximum temperature by turning set
screw on valve cap.
C
H
1/4"
1/4"
UP
A
Place the escutcheon and handle on the
wall over the valve and secure with the
screws provided.
The included foam rim seal may be applied to the back of
the escutcheon 1/4" from the outer edge, with the seam
at the bottom.
WARNING! The temperature limit stop has been factory
preset for maximum temperature operation.
Failure to adjust the limit screw to a safe
shower temperature could result in the
user being scalded.
Connect Valve and Adjust Valve Temperature
2
Attach Escutcheon and Handle
3