Installation
S19-2000, S19-2000EFX
Bradley
• 215-1291 Rev. S; ECN 17-09-009
12/7/2017
5
When the check stops are in the fully open (opera ting)
position, the stem will extend approximately 1/2" (13mm)
from the stem nut.
Check for leaks by pressurizing unit SLOWLY.
Check the temperature when approx. 3-5 gpm water flow
is reached (equivalent to one eye wash or face wash)
and adjust if necessary.
Check the temperature when approximately 3 – 5 gpm
water flow is reached (equivalent to one eye wash).
Tempered Water
(to Fixture)
HOT
COLD
Stem Nut
C
H
Open
Close
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off, check
to make sure the cold water continues to flow. If the cold water is flowing properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off, check
to make sure that the hot water flow has shut down to less then 0.5 gpm. If hot water is shut down, fully reopen cold water supply.
This device must be checked for final temperature and adjusted as
necessary. The standard preset factory temperature setting is 85°F
(29°C) [the range of the valve is 65°F–90°F (18°C–32°C)]. Insert
Allen Wrench through the hole in the cap and into the set screw
to adjust. Consult proper medical and/or safety authorities for the
optimum temperature recommended for your particular application.
5/64" Allen Wrench
S19-2000 Shown
Test the system weekly (turn on the water supply and check for constant control of the desired set
temperature).
Hole In Cap
Stem
No single emergency fixture supplied by this device shall
have a minimum flow rate less then 1.5 gpm.
Connect Supply Lines and Install Thermometer
2
Adjust Temperature with Water Running
3
Test Unit
DO NOT SKIP THIS STEP!!!
4