36
PDV Series
36
Installation of Inner Door with Gasket (cont.)
Step 14.
Firmly place right side inner door flange against the left side inner door flange and secure with
(2) ¼” hex drive screws from step 5.
DO NOT OVER TIGHTEN SCREWS
.
Step 15.
Align right side inner door to combustion chamber and verify the fastener holes of the
combustion chamber are aligned with right side inner door slotted opening. Verify seal integrity
around combustion opening. Secure right side inner door using ¼” hex drive screws from step
4.
DO NOT OVER TIGHTEN SCREWS
. Verify both left and right sides of inner door are
properly positioned and sealed against the combustion chamber.
Step 16.
Replace outer jacket burner access door.
Step 17.
To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.