F
i
g
ure
6
O
P
EN
C
IR
C
UIT THERMO
P
ILE TE
S
TING
Step 1. Disconnect red and white thermopile wires from the wire harness leading to the gas control.
Step 2. Using a multimeter capable of reading millivolts, check across thermopile leads.
Step 3. Following the instructions located on the lighting instruction label or the lighting instructions located in the
installation and operation manual, proceed to light the pilot and allow the gas control to operate for three
minutes.
Step 1. Closed circuit testing is the preferred method for testing the thermopile. Following the instructions
located on the lighting instruction label or the lighting instructions located in the installation and operation
manual, proceed to light the pilot and allow the control to operate for three minutes.
Step 2. Using a multimeter capable of measuring millivolts, measure across thermopile connections at the
gas control (see Figure 6).
C
LO
S
E
D
C
IR
C
UIT THERMO
P
ILE TE
S
TING
T
hermopi
l
e
Connections
at
g
as
contro
l
P
a
g
e
7
F
i
g
ure
5
Gas
Contro
l
K
nob
S
ERVI
C
E
P
RO
C
E
D
URE
A
G-I
Thermocoup
l
e
Testin
g
and
Rep
l
acement
F
or
M
ode
l
s
U
sin
g H
oneywe
ll
Gas
Contro
l
NOTE:
I
t
may
be
necessary
to
ho
l
d
the
g
as
contro
l
knob
down
in
the
“
PI
LOT”
position
continuous
l
y
throu
g
hout
this
test
.
NOTE:
I
t
may
be
necessary
to
ho
l
d
the
g
as
contro
l
knob
down
in
the
“
PI
LOT”
position
continuous
l
y
throu
g
hout
this
test
.
I
n
a
C
LO
S
E
D
C
IR
C
UIT
test
:
Any
readin
g
over
300
mi
ll
ivo
l
ts
indicates
g
ood
thermopi
l
e
output
.
F
or
readin
g
s
under
300
mi
ll
ivo
l
ts
rep
l
acement
of
thermopi
l
e
is
recommended
.
I
n
an
O
P
EN
C
IR
C
UIT
test
:
Any
readin
g
over
4
00
mi
ll
ivo
l
ts
indicates
g
ood
thermopi
l
e
output
.
F
or
readin
g
s
under
4
00
mi
ll
ivo
l
ts
rep
l
acement
of
thermopi
l
e
is
recommended
.
7