background image

4

A/200N

A/200n

A/200N

43,5

45

7,5

57

105

106

A

B

64,5

105

14

5

1

2

3

1

2

3

4

INSTALLATION

•  The power supplier must ALWAYS be installed horizontally.

•  The device can be installed on a DIN rail (EN 50022) in an appropriate electric panel or it may be wall-mounted using 

the protective terminal covers.

•  For disassembly, proceed as shown in figure 2-3-4.
•  For the overall dimensions see figure 1.

NOTE. Proper ventilation is required if the power supplier is installed in a metal container.

OPERATING CHARACTERISTICS

The unit is equipped with a transformer capable of powering the HPC/1 entry panel and max. 20 HPP/6 panels.
The unit features the following functions:
- 2 two-tone call notes for entry panels (or for supplementary calls, e. g. landing calls).
- Power supply and control of electric lock (12 V AC, 1 A) by means of relay (inside the unit) with timer-controlled interval adjustable from 2 to 15 seconds by means of poten-
tiometer P1, figure 3. 
-Call generator: 2 types of two-tone call (up to 3 internal units can be connected in parallel to the same call).
The unit can be powered from a 12 V DC power supply, e. g. battery or uninterruptable power supply (terB and 5). The unit has no battery protection.

A

5 8

+B 5 21 8 8A 11 12 23 16 NO C NC

9

B

C

P1

TERMINAL BOARDS

A

~

Mains

~

B

+B

5

12 V DC input (*)
Ground

21

11 V DC output

8

call common 1 output

8A

call common 2 output

11

audio from entry panel

12

audio to entry panel

5 – 

output 14 V AC

6 + 

NO

Normally open

relay
contacts

C

common

NC

normally closed

C

5

ground

8

Audio to receiver

9

Audio from receiver

(*) The appliance is electronically protected against 
overloads and short circuits.

TECHNICAL FEATURES

Supply voltage

230 VAC 50÷60 Hz

Rated power

34 VA

Output voltages

11 VDC, 150 mA
14 VAC, 650 mA

Peak output voltages

300 mA

Operating output voltages

1A

Dimensions

4 DIN

Storage temperature

-25 °C +70 °C

Operating temperature

0 °C +35 °C

IP Degree

IP 30

Summary of Contents for AG2K200C03UK

Page 1: ...Installation Manual AGATAKIT C 200 UK AGATA P1 A 200N TARGHA 200 24806770 07 05 2013 ...

Page 2: ...2 AGATA P1 HA 200 A 200R HBP HPC 1 AGK200C03UK HPC 2 AG2K200C03UK HPC 3 AG3K200C03UK HPC 1 HNA AGK200C03HNA ...

Page 3: ...h the shell to the bottom of the device fig 4 AGATA P1 2 1 4 3 Ø60 503 Terminal boards M1 5 Ground 7 Call input from entry panel 8 Audio FROM entry panel 9 Audio TO entry panel 5 7 8 9 M1 BP1 P1 BP1 In order to make the door open but ton active only when the reciever is up cut the BP1 wire link P1 Optional AGATA P1 auxiliary function switch housing Door lock release Auxiliary 2 w Only use soft dry...

Page 4: ...ontrolled interval adjustable from 2 to 15 seconds by means of poten tiometer P1 figure 3 Call generator 2 types of two tone call up to 3 internal units can be connected in parallel to the same call The unit can be powered from a 12 V DC power supply e g battery or uninterruptable power supply terminals B and 5 The unit has no battery protection A 5 8 B 5 21 8 8A 11 12 23 16 NO C NC 9 B C P1 TERMI...

Page 5: ...s Hole plugs Cable guide joints Cable guide joint Spacer Joint Screws Screws and anchors KHPS Button KHPD Buttons Micro contact Micro contacts Button spring Buttons spring HPP 6 HPP 12D Plate Micro contacts with common call Lighting module Cable clamp plates Hole plug ACCESSORIES ...

Page 6: ... at the bottom and fasten it using the screw provided fig 7 WALL MOUNTING Apply the two hole plugs at the base fig 8 Fit the embedding box HBP 3 module or round Ø 65mm version flush with the wall at an appropriate height In the case of video entry panels the height should be such as to exploit the features of the camera to the full Fasten the base onto the wall using the screws and screw anchors s...

Page 7: ... order to fit the front plate first insert the upper part in the top moulding and then using a Allenkey s 2 5 tighten the lock screw fig 1 2 1 2 3 4 5 1 2 5 21 8 11 12 14 5 21 8 11 12 14 2 A 1 3 4 5 6 SIDE BY SIDE RECESSED INSTALLATION For horizontal fig 1 2 or vertical fig 3 4 combinations remove the hole plugs and insert the cable guide joints Fit the spacer into embedding boxes to avoid deforma...

Page 8: ...be enabled first Activating the alarm the relay 2 is activated by pres sing key before entering your user code see fun ction 10 for disabling instructions All user codes associated with relay 1 are enabled when the alarm is activated Activating the bell the relay 2 is activated by simply pressing key once To prevent false alarms being sent the option of asso ciating usercodes with relay 2 is autom...

Page 9: ...ult setting 5 s 1 Enter FUNCTION CODE 2 Select the RELAY you want by entering 1 or 3 Enter ACTIVATION TIME in the range 01 to 65 s 4 Repeat the procedure from point 2 to set the other relay s activation time or select another function FUNCTION 07 Setting keypad lockout time default setting 10 s 1 Enter FUNCTION CODE 2 Enter LOCKOUT TIME in the range 01 to 65 s FUNCTION 08 Setting monostable or bis...

Page 10: ...10 ...

Page 11: ...11 ...

Page 12: ...nd of its life cycle take measures to ensure it is not discarded in the environment The equipment must be disposed of in compliance with the regulations in force recycling its component parts wherever possible Components that qualify as recyclable waste feature the relevant symbol and the material s abbreviation BPT S p A a Socio Unico Via Cornia 1 33079 Sesto al Reghena PN Italy www bpt it info b...

Reviews: