Dismantling
The dismantling procedure should follow the assembly steps in reverse order, take
particular attention with regard to the removal of guardrails and platforms.
You should ensure that you are standing in a safe position and protected by guardrails at
all times
.
NEVER remove diagonal braces or stabilisers prematurely.
After removing the toe-boards the operator disengages the horizontal guardrail brace
clamps furthest from the trap door
. H
orizontal guardrail braces are then removed with
the operator positioned through the trap door
(3T)
before descending to the lower level,
from where the upper platform
,
diagonals
and frames can be removed.
Attach one stabiliser to each corner of
tower at approx. 45 degrees.
Position
the lower clamp so that the lower arm is
as close to the horizontal as possible
(see opposite). Adjust the position of the
top clamp to ensure the stabiliser foot is
in firm contact with the ground. Ensure
clamps are secure.
When using the S2 stabilisers, always
extend the telescopic legs to their
maximum position and lock into position
with the interlock clip.
When moving the tower lock each
stabaliser
leg just clear of the ground,
unlock castors ensuring area is firm and
clear of all obstructions both on the
ground and above.
After moving check all castors are firmly
on the ground and locked, and that the
tower is vertical. Re-position stabilisers
as
explained
above.
Static Stabiliser
M
aximum
P
latform
H
eight
:
Single Width 850
= 8.2m
Double Width 1450
= 8.2m
Telescopic Stabiliser
Maximum Platform Height:
Single Width 850 = 8.7 - 12.2m
Double Width 1450 = 8.7 - 12.2m
DO NOT OVERREACH
NEVER DROP COMPONENTS
WHEN DISMANTLING - always lower
them to the ground.
STABILISERS
STABILISERS - S1
STABILISERS - S2
3500mm
5000mm
15