12
Putting into operation
Jelly power pack Edition 09.09
4.
Putting into operation
The implement is exclusively suited for
operation with alternating current (400 V
/ 50 Hz. Never try to use other sources of
current. Ensure that the voltage of the
implement and your supply voltage are
the same.
Any work on the electric supply may
only be carried out by a skilled
electrician. Check the electric equipment
of your implement at regular intervals.
Immediately remove loose connections
and scorched cables.
- Check whether the electric circuit is protected by
fuse with 16 Ampere.
- If so, connect the implement with the aid of the
CEE-power plug to the power supply.
4.1
Operation
Only operate the implement with all
guards fully functioning. Check the
implement for externally noticeable
damage at least once a day.
Never leave your implement unattended
while the implement is connected to the
power
supply
or
to
an
external
compressed-air system.
When operating the implement it is
imperative to observe the instructions
regarding the
•
intended use
•
training of personnel.
Do not drag the implement by using the
power supply cable or the agent-hose.
Protect the spray gun during spraying
pauses against unintentional spraying
by turning the locking device (1).
Summary of Contents for Jelly power pack
Page 38: ...38 Circuit diagrams Jelly power pack Edition 09 09 7 Circuit diagrams...
Page 39: ...Circuit diagrams 39 Jelly power pack Edition 09 09...
Page 40: ...40 Circuit diagrams Jelly power pack Edition 09 09...
Page 41: ...Circuit diagrams 41 Jelly power pack Edition 09 09...
Page 42: ...42 Circuit diagrams Jelly power pack Edition 09 09...