Putting into operation
15
Jelly economy Edition: 01.10
4.4
Switching the implement on/off
Switching on
- Press the on-/off switch (1).
- It will flash:
•
the green control light (2) and
•
the red temperature-control light (3).
The compressor starts running and
provides the factory set spraying
pressure of 2.8 bar. The agent-feed-
pump sucks jelly out off the jelly
container and provides the flow-heater
and agent-hose with jelly.
The flow-heater and the agent-hose heat
the jelly up to the prior set processing
temperature.
The implement is ready for operation, if
the red temperature-control light (3)
goes out.
If the implement is cold, the heating
period will last approx. 10 minutes.
Ensure that there is always agent in the
flow-heater when the implement is
switched on. When the jelly container is
empty, no material flows. This would
cause a running dry of the agent-feed-
pump and agent burning inside the flow-
heater. The running dry damages the
agent-feed-pump.
Switching off
- Press the on-/off switch (1).
After the implement has been switched
off, the green control light (2) goes out.