Tank Function Test
X35 version 4.02.511
The following pages will outline the steps necessary to complete a
comprehensive functional test on a
7000 series tank with ASC
Please refer to the Bourgault X35 operators manual for version
4.02.511 for detailed descriptions and procedures when required.
You may also wish to view the Bourgault video located in the
Bourgault YouTube channel.
Summary of Contents for 7000 Series
Page 1: ...Functional test for 7000 units with ASC ...
Page 3: ...Before starting the functional test you should fill out this form kuk ...
Page 6: ...Go to User Region Units and make sure the units are as indicated above ...
Page 8: ...Also in System Features Console make sure the XTEND is Enabled ...
Page 17: ...After selecting one of the 4 options above press the check mark ...
Page 18: ...Press the check mark to advance ...
Page 21: ...Press the green check mark to advance to section or a Drill Template ...
Page 22: ...Select Bourgault then press the check mark to advance ...
Page 23: ...Press the check mark to advance ...
Page 32: ...Select Replace to open the wizard for detecting the first ECU ...
Page 33: ...Read the warning and acknowledge it to advance ...
Page 34: ...Follow the instructions in the wizard and advance ...
Page 37: ...Follow the wizard and then advance ...
Page 38: ...Accept the ECU ...
Page 41: ...Follow the Wizard and advance ...
Page 42: ...Advance to next slide ...
Page 44: ...Follow the Wizard again ...
Page 45: ...Advance ...
Page 46: ...The Blockage is now designated EM 24 3 Review and accept ...
Page 48: ...Go to Pack Master and enable it if your drill is equipped with it ...
Page 49: ...Change the Control Type to Pack Force and enter Preset 1 and 2 as well as an INCREMENT ...
Page 50: ...Confirm drill model Then select opener type equipped on drill Example PHD or XTC ...
Page 51: ...If equipped with Blockage go to Implement Seeder Accessories Blocked Head and Enable it ...
Page 55: ...Boom 1 is full width ...
Page 56: ...Our unit has dual boom section control so boom 2 is the Seed section control boom ...
Page 57: ...Boom 3 is Fertilizer section control ...
Page 60: ...For our demonstration we matched up the NH3 sections to the granular sections ...
Page 62: ...Enable the VIRTUAL SECTION SWITCHBOX ...
Page 66: ...Move over to Drive Setup and enter the type of auger in each tank with a metering auger ...
Page 68: ...If equipped with NH3 or Liquid enter the tank CAPACITY and the on and off timings ...
Page 69: ...Enter the NH3 Liquid CALIBRATION FACTOR ...
Page 71: ...If your system has integrated scales you click on DETECT NEW ECUS ...
Page 72: ...After detecting the new ECU press the check mark to advance ...
Page 74: ...The above settings are default settings ...
Page 77: ...This is where you can enable an audible click for the above functions if desired ...
Page 83: ...Pull all of your products from the Bourgault list and advance the Wizard ...
Page 85: ...Select PRODUCT NAME to give a new custom name ...
Page 87: ...Advance the slide ...
Page 90: ...Select the running man to go back to the operating screen ...
Page 92: ...Ensure all of the Tanks Fans and Speed are displayed ...
Page 93: ...While this screen is up press on Tank 1 layout to configure the Tank 1 displayed items ...
Page 94: ...Set all of your Tanks to display Application Rate Motor Load and Metering RPM ...
Page 98: ...Expand each tank and click on select product ...
Page 101: ...Deselect the tanks on the right and select the calibration icon Enter a MANUAL SPEED ...
Page 102: ...Select the GPS Position mini view to verify that the monitor is receiving GPS ...
Page 104: ...Name the Client Farm and Field Next press the check mark in the green box ...
Page 105: ...Name the Job FUNCTION TEST then press select check mark in the green box ...
Page 106: ...Press the green box with the check mark ...
Page 108: ...If the Master icon is Red lower right corner press it to see what is not ready ...
Page 109: ...With both fans engaged make sure you have RPM displayed for both ...
Page 111: ...2300 psi to get 6000 rpm No more than 450 psi back pressure ...
Page 113: ...Enter Calibration ...
Page 114: ...Enter Automatic Calibration ...
Page 115: ...Advance the wizard ...
Page 122: ...Enter the Configuration menu then select Pack Master Calibration ...
Page 124: ...Follow the wizard for step by step instructions ...
Page 127: ...Enter the Packing Force lbs from the chart and advance the wizard ...
Page 129: ...Enter the Packing Force lbs from the chart and advance ...
Page 130: ...Pack Master should be calibrated ...
Page 133: ...Repeat the Pack and Lift Master tests from this screen ...
Page 146: ...Go back to the operating screen and enter the inventory manager ...