STEP-BY-STEP

 GUIDE

0800 003 006

   

/

   

boundaryline.co.nz

STEP 3 – 

INSTALLING RAILS | INSTALLING PALINGS

c. Top Rail

Place over the top of the palings, and tap down into the C post. Once in place, fix 

both sides of the rail to the C post using the tech screws provided. The top of the 
rail should be 15mm from the top of the post.

d. Check installation.

Top rail

a. Bottom Rail

Insert bottom rail between posts.

Adjust bottom rail to correct height - it is important to 

maintain a minimum gap of 50mm between bottom of rail and 

ground.

Screw fix the bottom rail at this stage.

b. Palings

Slide the first paling into the bottom rail with the 

groove in end of paling to the bottom.

Ensure a 15mm gap is between the edge of paling and 

the inside face of the post and push down firmly into the 

bottom rail. A rubber mallet can be used if required. 

-

 Continue to insert all palings, ensuring the tongue and 

groove joint is in place correctly. 

-

 Once all palings are installed it is time to fit your top 

rail.

Slide the first paling into the bottom rail with the 

tongue in edge of paling to the top. 

-

 Ensure a 15mm gap is between the end of paling and 

the inside face of the post and push down firmly into the 

bottom rail. A rubber mallet can be used if required. 

-

 Continue to insert all palings, ensuring the tongue and 

groove joints are in place correctly. 

Once all palings are installed it is time to fit your top 

rail.

Note: 

the half-palings with a groove to be installed at top 

of panel and half-paling with a tongue to be installed at 

bottom of panel. 

Bottom rail 

between  
C posts

C Posts

App

rox.

 50mm

For 

SmartWall Vertical

For 

SmartWall Horizontal

NOTE

SmartWall Vertical fence system is supplied with a Rail Support and this 
is to be inserted inside the bottom rail prior to it being installed. 

Summary of Contents for SMARTWALL

Page 1: ...STEP BY STEP GUIDE INSTALL GUIDE SMARTWALL A STEP BY STEP GUIDE TO INSTALLING YOUR FENCE...

Page 2: ...ART READTHIS TOOLS LIST It is recommended that the reader pays particular attention to those items identified as IMPORTANT in this manual to ensure satisfactory long term performance IMPORTANT the tab...

Page 3: ...STALLING POSTS a Fastening posts together b Fixing post in ground If it isn t possible to fix posts as proposed here please contact us for further information IMPORTANT Approx 40mm 2 Fasteners approx...

Page 4: ...l A rubber mallet can be used if required Continue to insert all palings ensuring the tongue and groove joint is in place correctly Once all palings are installed it is time to fit your top rail Slide...

Page 5: ...ay particular attention to the area under the top rail which is sheltered from natural washing by rain 2 DO NOT build up soil garden fill and or dirt against the bottom rails and posts of your fence a...

Page 6: ...ess Otherwise specified All units in Millimeters Linear Tolerance 0 5mm overall Angular Tolerance 0 5mm overall Revision Patent Pending NZ Pat App 745289 753226 POST CAP POST TOP RAIL CLT LAMINATED PA...

Page 7: ...rwise specified All units in Millimeters Linear Tolerance 0 5mm overall Angular Tolerance 0 5mm overall Revision Patent Pending NZ Pat App 745289 753226 GOOD GROUND 100KPA ALLOWABLE BEARING AS DEFINED...

Page 8: ...s including the number of surrounding properties and how exposed the location is If your property is exposed to higher wind speeds please contact us for further advice recommendations Also if in proxi...

Reviews: