![Boundaryline SMARTWALL Install Manual Download Page 4](http://html1.mh-extra.com/html/boundaryline/smartwall/smartwall_install-manual_2796666004.webp)
4
STEP-BY-STEP
GUIDE
0800 003 006
/
boundaryline.co.nz
STEP 3 –
INSTALLING RAILS | INSTALLING PALINGS
c. Top Rail
-
Place over the top of the palings, and tap down into the C post. Once in place, fix
both sides of the rail to the C post using the tech screws provided. The top of the
rail should be 15mm from the top of the post.
d. Check installation.
Top rail
a. Bottom Rail
-
Insert bottom rail between posts.
-
Adjust bottom rail to correct height - it is important to
maintain a minimum gap of 50mm between bottom of rail and
ground.
-
Screw fix the bottom rail at this stage.
b. Palings
-
Slide the first paling into the bottom rail with the
groove in end of paling to the bottom.
-
Ensure a 15mm gap is between the edge of paling and
the inside face of the post and push down firmly into the
bottom rail. A rubber mallet can be used if required.
-
Continue to insert all palings, ensuring the tongue and
groove joint is in place correctly.
-
Once all palings are installed it is time to fit your top
rail.
-
Slide the first paling into the bottom rail with the
tongue in edge of paling to the top.
-
Ensure a 15mm gap is between the end of paling and
the inside face of the post and push down firmly into the
bottom rail. A rubber mallet can be used if required.
-
Continue to insert all palings, ensuring the tongue and
groove joints are in place correctly.
-
Once all palings are installed it is time to fit your top
rail.
Note:
the half-palings with a groove to be installed at top
of panel and half-paling with a tongue to be installed at
bottom of panel.
Bottom rail
between
C posts
C Posts
App
rox.
50mm
For
SmartWall Vertical
For
SmartWall Horizontal
NOTE
SmartWall Vertical fence system is supplied with a Rail Support and this
is to be inserted inside the bottom rail prior to it being installed.