18
Select two holes in the middle of the
top rail as starting point.
For even distribution of spring tension
and ease of assembly, the springs
must always be installed on opposite
sides of the frame in an alternating
manner, i. g. 1
st
and 2
nd
, followed by
3
rd
and 4
th
as shown in FIGURE 1 .
STEP 6 FOR 12FT
The number of triangle-rings sewn on the mat is equal to the number of holes in the frame. lf you
notice that you have miscounted a hole or triangle-ring, remove and reinstall the springs as necessary
while maintaining an even distribution of tension as explained above.
Please count carefully in the following steps. If you attach a spring incorrectly you can damage the
mat.
WARNING
Heavy gloves must be used to protect your hands from pinch points assembly and goggles
must be worn to avoid injuries to the eyes.
4
1
#13
#15
2nd
1st
4th
3rd
FIGURE 1
Summary of Contents for 201806
Page 13: ...12 Trampoline Assembly STEP 1...
Page 14: ...13 STEP 2 Note Repeat step 2 to assemble five more leg sections...
Page 15: ...14 STEP 3 FOR 12FT...
Page 16: ...15 STEP 3 1 FOR 15FT...
Page 17: ...16 STEP 4 Note Repeat step 4 to assemble five more Top Rail and Leg...
Page 18: ...17 STEP 5 NOTE...
Page 28: ...27 STEP 7...
Page 29: ...28 STEP 8...
Page 30: ...29 STEP 9 G C C C C D G C C C C C D...
Page 31: ...30 STEP 10...
Page 32: ...31 STEP 11...
Page 33: ...32 STEP 12...