9e947
c
11/24/17
14
ViewPoint Touch Screen Installation Instructions
4. Commissioning Checklist
The items below cover the steps that need to be tak-
en to ready the product for use. The checklist will be
completed by the dealer during installation and will
become part of the complete CASE document for the
installation. The second part of the CASE program
will be a verification that the system is working to
BouMatic specifications.
ACTION
CHECK MARK
Arm/Floor mount secured properly
Power supply enclosure mounted in parlor office
Power supply voltage adjusted to 25.5 VDC
Verify power and ethernet connections
Ethernet switch has power
Screen powers up